Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T17CM01297
Parcel: 13405118R

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T17CM01297
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2017 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
04/04/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change According to the submitted development plan (DP16-0212), the building sewer is existing to within 5-feet of the building and was built as part of the private sewer collection system. Revise the plumbing plan to reflect that condition. [Initial comment: Provide the civil drawings referenced on sheet P1 that show the location, route and size of the proposed building sewer, the locations of the cleanouts, and the point of connection to the public sewer. Reference: Section 107.2.1, IBC 2012.]
04/04/2017 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The thermal resistance of the sheathing and built-up roofing is included with the component description in COMcheck. A continuous layer of insulation (e.g. polyisocyanurate foam) would have to be added to the roof construction to be shown under the "continuous insulation" entry in COMcheck. The section notes on sheet A3 call out R-42 batt insulation for the roof with no additional continuous insulation, the energy code compliance notes on sheet A4 call for R-49 batt insulation for the roof with 1" foam, and the section notes on sheet A5.1 call out R-38 batt insulation for the roof with no additional continuous insulation. Coordinate the various notes with each other and with COMcheck. [Initial comment: With regard to the COMcheck Envelope Compliance Certificate, show how a continuous layer of insulation (R-2) is to be installed on the roof assembly. Reference: Section 303.2, IECC 2012.]
2. The section notes on drawing A5.1 calls out for R-19 batt insulation for the exterior walls, the section notes on sheet A3 call for R-24 batt insulation for the exterior walls and the energy code compliance notes on sheet A4 call for R-24 batt insulation in the exterior walls. Only the energy code compliance notes on sheet A4 identify the thermal resistance of the EFIS. Coordinate the various notes with each other and with COMcheck. [Initial comment: The COMcheck Envelope Compliance Certificate calls out R-24 cavity insulation in the exterior walls along with R-2 continuous insulation. The exterior wall sections on A5.1 show R-19 cavity insulation and do not specify the R-value for the continuous insulation (see Specification Section 07240-2D on sheet A6). Reference: Section C103.2, IECC 2012.]
3. Coordinate the SHGC used for COMcheck (0.27) with the SHGC shown in the energy compliance notes on sheet A4 (0.5). The projection factor (pf) is not the same as a shade coefficient. Add a note to the energy compliance notes that the fenestration shall be NFRC -certified for U-value and the Solar Heat Gain Coefficient. [Initial comment: Coordinate the window specifications (Section 08800, A6) with the window descriptions used on COMcheck. Note that the fenestration shall be NFRC -certified for U-value and the Solar Heat Gain Coefficient. Reference: Sections C103.2 and C303.1.3, IECC 2012.]
4. Coordinate the SHGC used for COMcheck (0.27) with the SHGC shown in the energy compliance notes on sheet A4 (0.5). The projection factor (pf) is not the same as a shade coefficient. Add a note to the energy compliance notes that the fenestration shall be NFRC -certified for U-value and the Solar Heat Gain Coefficient. [Initial comment: Specify the U-value and the Solar Heat Gain Coefficient for the glazed door on the drawings and coordinate the values with COMcheck. Reference: Sections C103.2 and C303.1.3, IECC 2012.]
5. The heat pump schedule still includes the requirement for a barometric damper for air relief for all of the heat pumps. [Initial comment: Verify that the relief air outlet on the specified rooftop heat pumps is not located in a way that would allow recirculation of the relief air into the building. Reference: section C403.3.1.1.4, IECC 2012.]
04/04/2017 ROBERT SHERRY WATER REVIEW Reqs Change The submitted development plan (DP16-0212) does not clearly show the location of the water service to the building or indicate the materials of construction. Clarify how the water is to be routed from the meter and the backflow preventer to the building and the required shutoff valve. [Initial comment: Provide the civil drawings referenced on sheet P1 that show the location and sizes of the proposed water meter, backflow preventer, and water service to the building. Reference: Section 107.2.1, IBC 2012.]
04/11/2017 GERRY KOZIOL WWM REVIEW Needs Review