Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T17CM00618
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/26/2017 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | Unable to find a code review analysis. Are fire sprinklers going to be installed? What is going to be stored in the building, and in what quantities? |
| 02/08/2017 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | Zoning will reviewi the building plans on the next submittal and verify compliance with a revised DP. At this time there is no DP that has been approved for the new building. Also there may be an issue with the possible non-conforming use in this zone which may have to be evaluated by the Zoning Administrator. Contact Steve Shields 837-4956 for more information. |
| 02/10/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide drawings that adequately address the scope of work to be done and demonstrate that the work will conform to all relevant codes. Reference: Section 107.2.1, IBC 2012. |
| 02/10/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide drawings that adequately address the scope of work to be done and demonstrate that the work will conform to all relevant codes. Reference: Section 107.2.1, IBC 2012. |
| 02/10/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply system to become overloaded. Reference: Section 107.2.1, IBC 2012. |
| 02/14/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET S1.0 (FOOTING SCHEDULE); STRUCTURAL CALCULATIONS (FOUNDATION DESIGN): THE CALCULATIONS INDICATE FOOTING F1 HAS 5-#5 EACH WAY TOP AND BOTTOM. THE FOOTING SCHEDULE DOES NOT INDICATE TOP AND BOTTOM IN THE REINFORCING, AND REFERENCE SECTIONS 3/S2.0 AND 4/S2.0 DO NOT SHOW TOP AND BOTTOM REINFORCING. PLEASE VERIFY. 2. SHEET S1.0; FOUNDATION PLAN: THERE ARE NO STRUCTURAL CALCULATIONS FOR THE F-2 FOOTINGS INDICATED ON THE PLAN. WHAT ARE THESE FOOTINGS FOR? PLEASE CLARIFY AND ADD STRUCTURAL CALCULATIONS FOR THEIR DESIGN. 3. SHEET S2.0; SECTION 10: PLEASE COMPLETE THE REFERENCE SECTION AT THE SLAB EDGE. 4. METAL BUILDING DRAWINGS/CALCULATIONS: PER THE IBC SECTION 107.3.4.1, DEFERRED SUBMITTAL DOCUMENTS MUST BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE AND REVIEWED AND FOUND IN GENERAL CONFORMANCE TO THE BUILDING DESIGN. PLEASE FOLLOW THE REQUIREMENTS OF THAT SECTION. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 02/15/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 02/22/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | PLEASE ADDRESS THE FOLLOWING ELECTRICAL PLAN REVIEW COMMENTS. ALSO PROVIDE A WRITTEN RESPONSE. #1. REVISE THE ELECTRICAL ONE LINE DIAGRAM TO AN UNDERGROUND FED SERVICE LATERAL. CITY OF TUCSON AMMENDMENT TO THE 2012 IBC, SEC. 112.1. SEC. 112.1.1 REQUIRES ALL NEW CONSTRUCTION TO UTILIZE UNDERGROUND FED ELECTRICAL SERVICE EQUIPMENT. REF: 2012 IBC, 2011 NEC. |
| 02/24/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review | Provide approved Development Package for this project. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/02/2017 | LBOJORQ1 | OUT TO CUSTOMER | Completed |