Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T17BU00093
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/02/2017 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Completed | |
03/02/2017 | CTREVIL1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/02/2017 | CTREVIL1 | ENGINEERING | REVIEW | Passed | |
03/02/2017 | ELEIBOL1 | DOT ENGINEERING | REVIEW | Approved | Stormwater Manager spoke with Rob this afternoon and went over the Corbett Building Scope letter. I have the following comments: City Stormwater Management accepts the scope and concurs with the approach to address safety issues and specifically stormwater concerns. The following clarifications were explained to ServPro: 1 - Stormwater Inspector shall inspect storage tank and secondary containment; 2 - Stormwater Inspector shall inspect manhole prior to discharge to other system (to confirm that line is not part of stormwater system); 3 - Corbett Building Scope letter did not have date on it - future correspondence should include date; 4 - Corbett Building Scope letter referred to City for regional wastewater reclamation department, however this is Pima County Regional Wastewater Reclamation Department; 5 - Corbett Building Scope letter referred to Tucker Labs for analysis of runoff water; however the lab is actually Turner Labs, Tucson; 6 - ServPro will continue to keep City Stormwater Manger in the loop with hazard and remediation efforts, and City Stormwater staff will await upcoming demo permit for review. Elizabeth Leibold P.E., CPM, CFM Engineering Review Division Department of Transportation https://www.tucsonaz.gov/tdot/engineering City of Tucson (520) 837-4934 (office) |
03/02/2017 | CTREVIL1 | FIRE | REVIEW | Passed | |
03/02/2017 | CTREVIL1 | OIP | REVIEW | Passed | |
03/02/2017 | CTREVIL1 | ZONING | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/02/2017 | LBOJORQ1 | OUT TO CUSTOMER | Completed |