Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T16PI00018
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 10/12/2016 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 10/21/2016 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | You have an private irrigation line crossing a public roadway. You will need to have an easement recored if you do not already have one. |
| 11/03/2016 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | November 1, 2016 SUBJECT: Paving Plans for La Trinidad, Lots 1-14 PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Include the plan number "I-2016-016" in the title block of each sheet. 2. Include the PIA activity number "T16PI00018" on cover sheet. 3. Use COT north arrows per COT Office Procedure No. 8-1552-002, Drafting Standards. Drafting standards can be found at: https://www.tucsonaz.gov/files/transportation/PIA_Guidelines_&_Checklist.pdf 4. A public pedestrian access easement will be required for the sidewalk along Alvord Place. 5. Sheet 2: Call out proposed Scupper located on the east side of Alvord Place and reference detail. 6. Sheet 2, 3, & 4: label all BCRs, ECRs. Also provide offsets for all stationing. 7. Sheet 2: Provide left and right profiles of the cul-de-sac. 8. Sheet 2: Indicate the placement of a driveway apron based on PC/COT Std. Dtl. 206 for the detention/retention basin maintenance access. 9. Sheet 2: Indicate the placement of a gate for the detention/retention basin maintenance access. 10. Sheet 2: The minimum longitudinal roadway slope is 0.5% and the minimum roadway cross slope for a roadway with a longitudinal grade greater that 0.5% or greater is 2%. Verify that roadway grades and slopes comply with COT Technical Standards Manual Section 10-01.4.5. 11. Sheet 3 & 4: Indicate the placement of a minimum 2 feet wide pavement section at the beginning of the proposed pavement tapers. 12. Sheet 4: Call out curb transitions and reference PC/COT Standard Detal. 13. Sheet 4: Call out the placement of standard curb transitions at the scupper proposed at Sta. +/- 13+30, Lt (Jeanette Blvd). 14. Sheet 4: Where the sidewalk terminates at Sta. +/- 13+30, Lt (Jeanette Blvd), indicate that the top of sidewalk will match adjacent grade. 15. Sheet 4: Indicate the placement of curb terminal section where curb ends on Jeanette Blvd. 16. Sheet 4: Indicate the patching requirements for the proposed HCSs and indicate that the roadway will be fog sealed, per PC/COT Standard specifications for Public Improvements Section 40, after all utilities are installed. Sheet 5, Dtl. 1: Indicate placement of barricade railing along the back side of the sidewalk scuppers, also, indicate the inlet and outlet elevations and center stationing. 17. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
| 11/10/2016 | LPETERS2 | DOT PERMITS & CODES | REVIEW | Denied | Hi Pete, I have reveiwed the plans for La Trinidad Estates and have the following comment: 1. Drainage on Alvord Place. It appears that there is an asphalt hump at Alvord Place and Alvord. How does runoff get out of Alvord Place? No further comments. Lance Peterson 837-6777 |
| 11/10/2016 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | October 24, 2016 ACTIVITY NUMBER: T16PI00018 PROJECT NAME: La Trinidad Estates Lots 1-14 PROJECT ADDRESS: 5917 S Jeanette Blvd PROJECT REVIEWER: Zelin Canchola TDOT Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan therefore a revised plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. Sheet 2 of 5: 1. As noted on plan, revise number of no parking signs to 3. Add two signs to reflect no parking begin, and no parking end. 2. Depiction of no parking sign symbol is reversed. Change direction of panel facing travel lane. If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov |
| 11/28/2016 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 11/28/2016 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | NO RESPONSE - APPROVED PER RLEIGH 11/28/16 |
| 11/28/2016 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |