Plan Number: T16PI00015
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T16PI00015
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/23/2016 GARY WITTWER DOT LANDSCAPE REVIEW Denied Will the tree in the planter be destoyed? What size will the replacement tree be? Please clarify.
09/30/2016 LINZUNZA DOT PERMITS & CODES REVIEW Needs Review Date: September 30, 2016
PROJECT NAME: PCRWR Broadway Blvd Augmentation
ACTIVITY NO.: T16PI00015
PROJECT REVIEWER: Esteban Tineo, P.E., City of Tucson DOT Permit Review Section

Comments:

The TDOT Permit Review Section has reviewed the PIA Plan and recommends a resubmittal. The following comments need to be addressed in the subsequent plan submittal.

1. Please provide DOT Notes (see attached).

2. Please note that the proposed new sewer, shown on sheet 3 of 7, is not within an easement but in right-of-way, please revise.

3. Please note the following:

B. Permanent Patches

1. Permanent patches shall be in accordance with Standard Detail No. 216. Type B patches shall be used for all streets shown on the MS&R Plan and all inverted water-carrying streets. A list of inverted water-carrying streets will be maintained in the City of Tucson, Engineering Office. During trenching activities, care shall be taken to preserve the shoulder at the trench top.

2. For longitudinal trenches whose top widths exceed four feet, the roadway shall be repaved with a combination of materials having the same structural strength and surface course as the existing pavement according to the following schedule.

Trench/Width Repaving Width
4' - 12' One-half pavement width or one lane width, depending on trench location
Over 12' Full pavement width

4. Patches for transverse trench shall be twice the trench width.
10/20/2016 ESTEVAN TINEO DOT ENGINEERING REVIEW Denied Please see the following comments:

1. Cover Sheet: Please add signature line for CIty DOT.

2. Please add the following notes:

1. The Contractor must obtain an Right of Way Permit from the City of Tucson Transportation Engineering Division prior to any work in the City Public right-of-ways.

2. The Contractor must meet with the City's right-of-way inspector prior to any work in the public right-of-way.

3. All backfill, within the City of Tucson right-of-way, above the utility shading shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way inspector and City Engineer.

4. All pavement patching, within the City of Tucson right-of-way, shall be conducted in accordance to the City of Tucson Transportation Standard Details, Specifications, and as directed by the City of Tucson right-of-way inspector and City Engineer.

5. In accordance to the City of Tucson Standards, permanent pavement patching shall be warrantied for 5-years, pavement patch's failing within this period shall be repaired/replaced at no cost to the City of Tucson.

2. Sheet 3 of 7: Please verify stated Easments.
10/25/2016 JIM FEMLING DOT STREET MAINTENANCE REVIEW Approved
10/25/2016 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
10/25/2016 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed