Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T16PI00005
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/20/2016 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
06/20/2016 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
06/22/2016 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
06/23/2016 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | |
06/24/2016 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
07/12/2016 | LINZUNZA | DOT PERMITS & CODES | REVIEW | Approved | |
07/25/2016 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
07/25/2016 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approv-Cond | Sheet 11 of 12, Note 13 should read, A 14AWG IMSA-19-1984 7- Conductor solid wire cable shall be installed from each traffic signal terminal strip to associated mastarm signal head. Note 2 in Conductor notes should read, Intersection lighting wire splicing shall only occur within a pullbox and shall be made per standard specifications. Note 5 in Conductor notes should read, The contractor shall install new IMSA 16 conductor cables from the controller to the terminal block in the sidemount indication, unspliced. Outer cable jacket shall not be removed at handhole height. Add Note 6 as follows, All existing conductors shall be removed and replaced with new conductors per conduit and conductor schedule sheet 12 of 12. |
07/25/2016 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |