04/18/2016 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
04/18/2016 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
05/05/2016 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | May 4, 2016 ACTIVITY NUMBER: T16PI00005 PROJECT NAME: Banner UMC North campus PROJECT ADDRESS: 3838 N Campbell Avenue PROJECT REVIEWER: Zelin Canchola TDOT Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan therefore a revised plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. Sheet 1 of 11 note 11 - Type C not applicable. 2. Sheet 8 of 11 - Replace type C with Type G reflective pavement markers. Pavement marking checklist. - List quantities and descriptions for striping materials including number and type of RPMs, lineal footage, quantities on longitudinal and traverse striping, arrows and symbols. If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov |
05/17/2016 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
05/17/2016 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | May 9, 2016 SUBJECT: Offsite Improvements for Banner UMC North Campus PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Include the plan number "U-2016-007" in the title block of each sheet. 2. Include the PIA activity number "T16PI00005 on cover sheet. 3. Sheet 5-7: Provide a profile view of roadway TDOT Office procedure No. 8-1552-002 Types of Sheets 2.E. 4. Sheet 2: Remove Detail 1, detail is not applicable. 5. Sheet 2: Revise detail 2 to indicate percent of grade of landing and ramp section. Additionally, provide details of the ramp curb. 6. Sheet 5: Revise drawing to eliminate proposed driveway entrance at +/- 11+00 Rt Allen Rd. Sewer manhole can be accessed from roadway. 7. Sheet 5-7: Revise drawing to depict a flared side on both sides of the curb access ramps per PC/COT Std. Dtl. 207 Sheet 4A. 8. Sheet 5: Label newly dedicated right-of-way along the north side of Allen Road with recordation information. 9. Sheet 5: Revise drawing to indicate the finished surface treatment details for the proposed median island. 10. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
05/24/2016 | LINZUNZA | DOT PERMITS & CODES | REVIEW | Denied | Date: May 24, 2016 PROJECT NAME: Banner UMC North PLAN #: U-2016-007 ACTIVITY NUMBER: T16PI00005 PROJECT REVIEWER: Tom Adkins, Construction Inspector, Engineering, City of Tucson DOT Comments: The TDOT Construction Inspection Unit has completed the review of the PIA plan and recommends resubmittal at this time. The following comments need to be addressed in the subsequent plan submittal. Please return redlined drawings with next submittal and reference PIA activity number on all correspondences. 1. Page 5 of 11 Median Detail; Note 12; This is not a 207 ramp; provide better drawing to assure ADA Compliance - Specific Detail for this "Ramp". 2. Page 6 of 11 Sta14+61.59; 18.00Lt to 16+66.89; 23.63lt - why is this sidewalk staying in place when it does not match dimensions of new sidewalk? If you have any questions, I can be reached at 791-5100 or Tom.Adkins@tucsonaz.gov |
05/24/2016 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Denied | Date: May 24, 2016 PROJECT NAME: Offsite Improvements for Banner UMC North Campus PLAN #: U-2016-007 ACTIVITY NUMBER: T16PI00005 PROJECT REVIEWER: Paul Burton, Supervisor, TDOT Streets & Traffic Maint./Signal Electronics Comments: Sheet 10 of 12 Traffic Signal Note 14 should read "… outer cable jacket shall NOT be removed at the hand hole height…" Traffic Signal Note 16 should read "… law enforcement officer SHALL PROVIDE POINT CONTROL DURING THE CHANGE-OVER TO THE NEW SIGNALS AT THE CONTRACTOR'S EXPENSE." Conductor Note 4 should read "IMSA 16, 7, and 4 conductor cables…" Identify existing poles D through J Show existing video detection camera for eastbound traffic on luminaire mast arm of pole "D". Install "Q" head on SEC "A" pole for SB phase 5 turns. NEC - intercept existing conduits and extend to new #7 pull box with extension. Include note that intersection shall require new 16 conductor IMSA to be run, un-spiced, from the controller cabinet to each pole's terminal block. If you have any questions I can be reached at Paul.Burton@tucsonaz.gov |
05/25/2016 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | You must comply with all the requirement for placing irrigation lines under public roadways. Please call or e-mail me for those requirements. |
05/25/2016 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
05/25/2016 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |