Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T16PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
02/11/2016 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
02/18/2016 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
03/07/2016 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | If CA areas are to be landscaped, please submit a landscape plan and irrigation plan. NOTE: Private irrigation lines may not be placed under Public Roadways. |
03/14/2016 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Completed | NO ELECTRICAL |
03/14/2016 | CSALTZM1 | DOT ENGINEERING | REVIEW | Reqs Change | 1) Add Pavement Structural Section (include compactions) 2) Need Swpp 3) Sht. 5 of 10: 2/5 Storm Drainage Section A) Add headwalls at inlet and outlet B) Hand placed Rip Rap is flat - Add slope to drain 4) Sht. 5 of 10: 3/5Typical Section at the Storm Drainage Pipes A) Show R/W B) Add slope to new catch basin floor to drain C) Add headwall at outlet D) Add slope a cross hand placed rip rap to drain |
03/14/2016 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Denied | NEED ADDITIONAL INFORMATION |
03/15/2016 | LINZUNZA | DOT PERMITS & CODES | REVIEW | Denied | Date: March 15, 2016 PROJECT NAME: Mountain Vail Estates Part G - Phase 1 PLAN #: I-2016-003 ACTIVITY NUMBER: T16PI00003 PROJECT REVIEWER: Tom Adkins, Construction Inspector Spvr., Engineering Inspections Comments: The TDOT Engineering Inspections Unit has completed the review of the PIA plan and recommends resubmittal. The following comments need to be addressed in the subsequent plan submittal. " Detail 6, Page 3; Change Type 2 Corner Curb Radius to 2" " Detail 1, Page 4; Show 12" Radius to End Treatment of Barricade Railing " Detail 8, Page 4; Change Misspelled Word " Grater" to " Greater" " Detail 8, Page 4; No Width Dimension is Indicated Between Arrows Showing Distance from Back of Sidewalk to Right of Way " Detail 1, Page 5; Show 12" Radius to End Treatment of Barricade Railing " Detail 3, Page 5; Rip Rap Outlet Apron Shows Being Perfectly Flat. Is this Intentional? If so, Why? " Detail 3, Page 5; Catch Basin Cross Section Shows Sump Floor Being Perfectly Flat. Typically Must be Sloped at 4:1 Towards Outlet " Detail 2, Page 5; Rip Rap Outlet Apron Shows Being Perfectly Flat. Is this Intentional? If so, Why? " Detail 2, Page 5; Provide Elevation for Top of Toe Down Wall at Inlet Side of Drainage Pipe Culvert " Pages 6, 7, 8, Paving Keynote 6; Provide O.C Dimensions and Wire Size for W.W.F If you have any questions, I can be reached at 791-5100 or Tom.Adkins@tucsonaz.gov |
03/18/2016 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/18/2016 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |