Plan Number: T16PI00003
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T16PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/11/2016 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
02/11/2016 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
02/11/2016 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
02/18/2016 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved
03/07/2016 GARY WITTWER DOT LANDSCAPE REVIEW Denied If CA areas are to be landscaped, please submit a landscape plan and irrigation plan. NOTE: Private irrigation lines may not be placed under Public Roadways.
03/14/2016 ERNIE ENCINAS DOT_ELEC REVIEW Completed NO ELECTRICAL
03/14/2016 CSALTZM1 DOT ENGINEERING REVIEW Reqs Change 1) Add Pavement Structural Section (include compactions)
2) Need Swpp
3) Sht. 5 of 10: 2/5 Storm Drainage Section
A) Add headwalls at inlet and outlet
B) Hand placed Rip Rap is flat - Add slope to drain
4) Sht. 5 of 10: 3/5Typical Section at the Storm Drainage Pipes
A) Show R/W
B) Add slope to new catch basin floor to drain
C) Add headwall at outlet
D) Add slope a cross hand placed rip rap to drain
03/14/2016 JIM FEMLING DOT STREET MAINTENANCE REVIEW Denied NEED ADDITIONAL INFORMATION
03/15/2016 LINZUNZA DOT PERMITS & CODES REVIEW Denied Date: March 15, 2016
PROJECT NAME: Mountain Vail Estates Part G - Phase 1
PLAN #: I-2016-003
ACTIVITY NUMBER: T16PI00003
PROJECT REVIEWER: Tom Adkins, Construction Inspector Spvr., Engineering Inspections

Comments:

The TDOT Engineering Inspections Unit has completed the review of the PIA plan and recommends resubmittal. The following comments need to be addressed in the subsequent plan submittal.

" Detail 6, Page 3; Change Type 2 Corner Curb Radius to 2"
" Detail 1, Page 4; Show 12" Radius to End Treatment of Barricade Railing
" Detail 8, Page 4; Change Misspelled Word " Grater" to " Greater"
" Detail 8, Page 4; No Width Dimension is Indicated Between Arrows Showing Distance from Back of Sidewalk to Right of Way
" Detail 1, Page 5; Show 12" Radius to End Treatment of Barricade Railing
" Detail 3, Page 5; Rip Rap Outlet Apron Shows Being Perfectly Flat. Is this Intentional? If so, Why?
" Detail 3, Page 5; Catch Basin Cross Section Shows Sump Floor Being Perfectly Flat. Typically Must be Sloped at 4:1 Towards Outlet
" Detail 2, Page 5; Rip Rap Outlet Apron Shows Being Perfectly Flat. Is this Intentional? If so, Why?
" Detail 2, Page 5; Provide Elevation for Top of Toe Down Wall at Inlet Side of Drainage Pipe Culvert
" Pages 6, 7, 8, Paving Keynote 6; Provide O.C Dimensions and Wire Size for W.W.F

If you have any questions, I can be reached at 791-5100 or Tom.Adkins@tucsonaz.gov
03/18/2016 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
03/18/2016 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed