Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM09556
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2017 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | PASS PER ENEWCOMB |
01/03/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
01/03/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Completed | |
01/03/2017 | ROBERT SHERRY | WATER | REVIEW | Completed | |
01/03/2017 | GERRY KOZIOL | WWM | REVIEW | Completed | |
01/06/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The 2012 IECC is the currently adopted energy code (see sheet P0.1). 2. Provide the water schematic referenced in the plumbing fixture schedule. Verify that each appliance directly connected to water has a backflow prevention device. Reference: Section 107.2.1, IBC 2012 and Sections 608.1 and 608.16.10, IPC 2012. 3. If the ice maker does not have a listed, integral backflow preventer or an integral air gap conforming to Section 608.13.1, IPC 2012, specify the backflow prevention device to be installed. Reference: Sections 608.1 and 608.3, IPC 2012. |
12/22/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
12/22/2016 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
12/22/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/23/2016 | MARTIN BROWN | FIRE | REVIEW | Approved |