Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T16CM09367
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2017 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera PDSD Zoning Review Section PROJECT: T16CM09367 - Shell Building Building Plan Review (1st Review) 1765 W. Valencia Road - Related to DP16-0183 TRANSMITTAL DATE: January 3, 2017 DUE DATE: January 20, 2017 COMMENTS: 1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. While the building plans are consistent with the approved DP zoning cannot approve the Shell building plans until the Commercial Plans Reviewers have reviewed and approved or that the review comments will not require changes to the DP. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage to ensure consistency with the approved DP. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
01/12/2017 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | T16CM09367 - PLAN REVIEW COMMENTS Reviewer: Chris Anderson, January 12, 2017 BUILDING – COMMERCIAL On sheet TS-1, add a scale to the reference site plan and show all utility runs from utility taps to building. Indicate location and size of water meter on site plan. On sheet TS-1, add keynote legend for the reference site plan. On sheet TS-1, change the Outdoor Lighting Code edition to 2012 in the Applicable Codes table. On sheet A1.0, in the U-Factors descriptions, add R-5 continuous insulation for EIFS system at all exterior walls. Ref. IECC Table C402.2. Revise specification if necessary to comply. On sheet A1.0, in the U-Factors descriptions, add “opaque swing door U-factor to be a maximum of 0.61.” Ref. IECC Table C402.2. On sheet S1.0, footing sizes on foundation plan and footing schedule do not match what is shown in the structural calculations. Coordinate. Two columns shown along west wall are not included in structural calculations. Coordinate. On sheet S2.0, joist J-2 on the Joist Schedule shows 20 gauge joists, however the structural calculations show that J-2 joists should be 18 gauge. Coordinate. On sheet S2.0, add “SW2” to west end of south wall per structural calculations. Provide structural calculations for suspended steel awnings. |
01/12/2017 | PIMA COUNTY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
01/12/2017 | PIMA COUNTY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/12/2017 | FRODRIG2 | WATER | REVIEW | Approved | PER CHRIS AT PIMA COUNTY. |
01/12/2017 | PIMA COUNTY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | MECHANICAL – COMMERCIAL On sheet M2.0, the Rooftop Unit Schedule show that 21 tons of air conditioning will be provided for this 3,100 SF building using 150 SF per ton of air conditioning. Submit basis for this formula. |
01/17/2017 | FRODRIG2 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
01/17/2017 | GERRY KOZIOL | WWM | REVIEW | Reqs Change | The following is needed for Sewer Connection Fee Application Approval: Need PCRWRD/IWC/Steven Valencia review of 500 gallon grease interceptor – 520-724-6200 (steven.valencia@pima.gov) Need to review the location of building connection to the private sewer (possibly exiting wrong side) *Fees will be calculated on the basis of a 1-1/2” water meter - $27,30.00 – per plumbing drawings Hope this helps, Gerry |
12/28/2016 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
12/29/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/19/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |