Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM09237
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/09/2016 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
12/09/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
12/15/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/15/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/19/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/19/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Determine the heating and cooling loads in accordance with the methods shown in ASHRAE Standard 183. Reference: Section C403.2.1, IECC 2012. 2. The HVAC equipment (i.e. the specified packaged heat pumps) shall meet the minimum efficiency requirements. Reference: Section C403.2.3, IMC 2012. 3. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.2.4, IECC 2012. |
12/19/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | T&P relief pipe shall not connect to other pipes. |
12/19/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/19/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/21/2016 | GERRY KOZIOL | WWM | REVIEW | Completed | P16WX02365 |