Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM08878
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/28/2016 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
11/28/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
11/28/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide full compliance with the 2011 IECC for the lighting. |
11/28/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1: THECITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE ELEVATION 5 DIMENSIONS. 2. SHEET A2 (FLOOR PLAN); SHEET A4 (DETAIL 2, TYPICAL WALL BRACING DETAILS 2 AND 3): PLEASE INDICATE ON THE FLOOR PLAN THE WALL TYPES (FULL HEIGHT PARTITION, TYPICAL WALL BRACING DETAILS 2 AND 3) SO ALL NEW WALLS ARE IDENTIFIED. 3. SHEET A3; FLOOR AND WALL FINISH PLANS: PLEASE INDICATE ON THE DRAWINGS A KEY FOR THE WALL AND FLOOR FINISHES, DESCRIBING EACH (AS SHOWN ON THE PLANS). 4. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
11/28/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
11/29/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the termination points of the roof drains. Condensate drains may not terminate over a roof drain unless the roof drain itself terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2012. |
11/29/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide third-party listing for the shampoo sinks. Reference: Sections 303.4 and 402, IPC 2012. 2. Clarify the intent for the plumbing fixtures located in the restroom; are they existing to remain or are they new? If the faucet for the lavatory is new or is being replaced, it shall be a metering faucet per Section 416.6, IPC 2012, as amended by the City of Tucson. |
11/29/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/29/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/02/2016 | ARUIZ1 | WWM | REVIEW | Completed |