Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T16CM08766
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2017 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/17/2017 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Verify the size of the existing water meter serving this address and provide the serial number for the meter. Calculate the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2012. 2. Provide the size of the reduced pressure principle backflow prevention assembly serving this building. Reference: Section 107.2.1, IBC 2012. |
| 07/17/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Assign a letter or symbol designation for each luminaire to correlate with the luminaire schedule. #2. Provide compliance with the 2012 IECC for lighting. Ref:2012 IBC 107.2.1, 2011 NEC |
| 07/17/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: Growing Steps Daycare T16CM08766 Building Plan (2nd Review) TRANSMITTAL DATE: July 24, 2017 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Until DP17-0039 has been approved the building plan cannot be approved. 3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 07/17/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T1.0: The square footage calculations denoted on Sheet T1.0 does not match square footage denoted on Sheet G1.0. Please clarify. 2. Sheet T1.0: Location map is identified as the Sheet Index. Please revise. 3. Sheet T1.0: Sheet Index is identified as the Location Map. Please revise. 4. Sheet T1.0: Sheet Index includes Sheets DP1 & DP2. These sheets were not included. Please include these sheets in the plan set. 5. Sheet T1.0: Please include a site plan which accurately depicts the location of the building in relation to property lines, easements, adjacent structures etc. 6. Sheet G1.0: Sheet includes handwritten modifications. It is unknown if these modifications were made before or after the registrant's seal was affixed to the sheet. The sheet shall be revised to reflect the modifications and the registrant's seal shall be affixed with a current date. 7. Sheet G1.0 Building Analysis: Fire Protection per 903.2 is denoted as N/A; however, fire suppression system per Sec. 903 is listed as a deferred submittal. Please clarify and coordinate. 8. Sheet G1.0 Occupancy Classification: Please include the age group of the children receiving care. 9. Sheet G1.0 Plumbing Requirements: Plumbing fixture counts for water closets and lavatories in a Group E Occupancy shall be calculated at 1 per 50 occupants for male and 1 per 50 occupants for female. Please revise calculations to reflect separate male and female facilities. 10. Sheet G1.0 Plumbing Requirements: Drinking fountain calculation shall be 1 per 100 occupants or fraction thereof. Therefore, with an occupant load of 117 two drinking fountains are required. Reference IBC Section 2902.1.1 and Table 2902.1. 11. Sheet G1.0 Exiting: Provide information on exiting such as number of exits required, number of exits provided, required width of exits, width of exits provided, travel distance etc. 12. Sheet A1.0 Dimensioned Floor Plan: Other than door sizes, only one dimension is provided. Revise sheet to include all dimensions. 13. Sheet A1.4 Enlarged Bath: The 5' turn radius indicated on the plan overlaps a wall. Clear floor space in accordance with ANSI A117.1-2009 Section 305 shall be provided. 14. Sheet A1.4 Enlarged Bath: As proposed, the restrooms do not meet accessibility requirements. Restrooms shall be accessible in accordance with IBC Section 1109.2, ANSI A117.1-2009 Chapter 6 and details provided on this sheet. 15. Sheet A1.0 and A1.4: Restrooms shall be provided with a door or be arranged as to allow privacy. 16. Sheet A3.0 Building Section: Provide a valid ICC Evaluation Report for the proposed Stucco System denoted in the details. 17. Structural: Provide structural calculations for the site wall being used as a building wall, foundation, roof loads (rooftop units), wind loads, shear wall locations, columns, beams etc. 18. Structural: Include design criteria for all structural elements such as soils, concrete, rebar etc. 19. Structural: Include a list of all applicable special inspections. Reference IBC Chapter 17. 20. Structural: Provide a Special Inspection Certificate for required special inspections. Reference IBC Chapter 17. 21. Sheet S1.0: Sheet includes handwritten modifications. It is unknown if these modifications were made before or after the registrant's seal was affixed to the sheet. The sheet shall be revised to reflect the modifications and the registrant's seal shall be affixed with a current date. 22. Sheet S2.0: Sheet includes handwritten modifications. It is unknown if these modifications were made before or after the registrant's seal was affixed to the sheet. The sheet shall be revised to reflect the modifications and the registrant's seal shall be affixed with a current date. 23. Sheet S2.0 General Framing Notes: Note 5 states not to drill or notch trusses without approval from the Plans Designer. Please revise this to Architect/Engineer of Record. 24. Sheet S2.0: Provide a current ICC Evaluation Report for the Epoxy used for epoxy set bolts denoted in Detail 5. 25. Sheet S2.0: Provide a current ICC Evaluation Report for the Epoxy Set Bolts denoted in Detail 5. 26. Sheet S2.0: H1 (assume header 1) is denoted on the plans in multiple locations; however, a header schedule could not be located. Please include a header schedule in the plan set. 27. General: Provide written responses to all comments. |
| 07/17/2017 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 07/19/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012. 3. Show that the proposed replacement rooftop units meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 4. Provide heating and cooling load calculations that justify the capacities of the two packaged AC units serving the two new classrooms. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 5. Provide an economizer for each AC unit. The model number noted in the A/C Equipment Schedule is not for a packaged rooftop AC unit. Reference: Section C403.3, IECC 2012. 6. Provide manufacturer's specifications for both packaged AC units. Reference: Section 107.2.1, IBC 2012. 7. Verify that the parapet height within ten feet of the rooftop mechanical equipment is at least 42" above the walking surface of the roof or provide guards per Section 304.11, IMC 2012. 8. Revise plans as required to provide a separation of at least ten feet between air intake openings and exhaust openings. Reference: 401.4 (2), IMC 2012. 9. Revise the sequence of operation for both restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012. 10. Coordinate the Outside Air Ventilation Schedule with the balancing data for the exhaust fans shown on the mechanical plan. Reference: Section 107.2.1, IBC 2012. |
| 07/19/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the plumbing plan with the plumbing waste and vent diagram. Reference: section 107.2.1, IBC 2012. 2. Clarify where the storm water drainage from the new roofs will terminate. Reference: Section 1101.2, IPC 2012. 3. Show the natural gas piping system to clarify the required pipe sizes. The gas load calculation table calls for a 2" gas main but the plumbing plan calls for a 1-1/2" gas main to the meter. Reference: Section 402.3, IFGC 2012. |
| 07/25/2017 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 07/25/2017 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/24/2017 | QJONES1 | APPROVAL SHELF | Completed |
| 08/24/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
| 08/24/2017 | QJONES1 | REJECT SHELF | Completed |