Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2017 | KROBLES1 | WWM | REVIEW | Reqs Change | The following is needed for sewer connection fee application approval: Need COT building permit approval and COT on-site private sewer approval (may need PDEQ review for private sewer for multiple buildings) *the private sewer drawing for buildings #1 thru #5 was not submitted with the building permit package to PCRWRD Need industrial Wastewater Control(IWC) review and approval for restaurant grease interceptors– Steven Valencia (520-724-6200 (steven.valencia@pima.gov) If over 20 water supply fixture units, need PCRWRD capacity review – Kurt Stemm 520-724-6607 (kurt.stemm@pima.gov) Thank you, Gerry |
12/27/2016 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | No site planned included. Nothing to review. |
12/27/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show that the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2012 have been provided for this site. Reference: Section 107.2.1, IBC 2012. 2. Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2012. 3. Complete the water pressure and water fixture unit calculations for the total site. Verify the water pressure range with Tucson Water: the range is not 50 - 60 PSI. Reference: Section 107.2.1, IBC 2012. 4. Provide water fixture unit calculations for this activity. State the calculation method being used and use fixture units specifically for public-use fixtures. Provide the total water demand served by the water meter. Reference: Sections 604.1 and 604.3, IPC 2012, as amended by the City of Tucson. 5. Revise Kitchen Requirements item #N2 to comply with the requirements of Section 608.1, IPC 2012. 6. Provide a site drawing showing the size, route, and slope of the building sewer, the location of all cleanouts in the building sewer, and the location of the connection of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2012. 7. Calculate the total flow for the private sewage collection system for this project. If the total flow is in excess of 3000 gallons per day, the design for the system must be submitted to the Pima County Department of Environmental Quality for their approval prior to obtaining a permit for constructing the sewage collection system from the City of Tucson. Reference: A.R.S. 49-104 (B) (13). 8. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 709.1, IPC 2006. Include the total number of each fixture being installed. Reference: Section 710, IPC 2012. |
12/27/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
12/27/2016 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf. 2. Provide the size of the water meter proposed to serve this activity and the total water demand it will provide. Reference: Section 107.2.1, IBC 2012. |
12/28/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Passed | |
12/28/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/29/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/13/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |