Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T16CM08595
Parcel: 116140010

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/WWM

Permit Number - T16CM08595
Review Name: RESIDENTIAL - BLDG/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/08/2016 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T16CM08595
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

SECTIONS - DETAILS:

1. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing (closed cell spray or rigid board tight to the roof sheathing), R806.5. This condensation control provision is necessary for code compliance, and may be a single layer of air-impermeable insulation, or layered with batt insulation for achieving the total required roof R-value.

PLUMBING PLANS:

1. Clarify the pipe diameter at the point of connection of the new cold water line to existing service pipes. Existing water pipes may require replacement with larger sizes for controlling excessive water flow rates, P2903.7. A minimum 3/4" pipe is required for supplying water to the new bathroom fixtures. A minimum 1" pipe is required for supplying water to the building.

MECHANICAL PLANS:

1. Show location and size of the heating and air conditioning equipment, M1305.1.3. The size and weight of roof mounted equipment is required for the truss design, M1401.
2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical system calculations may be provided by deferred submittal. The deferred calculations must be approved through revision process prior to mechanical inspections.

ELECTRICAL PLANS:

1. Panelboards may not be located in storage rooms, clothes closets or bathrooms or over steps of a stairway, E3405.4. Relocate or delete the 60A fuse panel.
2. Show receptacle outlets at each kitchen counter space wider than 12" with no point along the wall line more than 24" from a receptacle outlet, E3901.4.1. .
3. Peninsular counter tops require at least one receptacle outlet within 12" below the countertop surface (at the end), E3901.4.2 and E3901.4.3.
4. Show the location of an equipment receptacle outlet and air conditioning disconnect on the roof, E3901.12 & E4101.5.

If you have any questions please contact:
Ken Van Karsen
(520) 837-4912
City of Tucson Residential Plan Review

Final Status

Task End Date Reviewer's Name Type of Review Description
12/29/2016 ARUIZ1 OUT TO CUSTOMER Completed