Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM08571
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/29/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/07/2016 | DAVID RIVERA | ZONING | REVIEW | Approved | |
12/07/2016 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the location, size, and serial number of the water meter serving this building (it is shown as being both 1" and ¾" on sheet P-1). 2. Show the size and proposed location of the backflow prevention assembly. |
12/07/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, safety pan, and valves. Reference: Sections 503, 504, 606.1, 607.2, and 607.3, IPC 2012. 2. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. Reference: Section 604.9, IPC 2012. 3. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012. 4. Provide insulation for a circulating hot water piping per Section C404.5, IECC 2012. 5. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference: Section C404.4, IECC 2012. 6. Revise the water demand calculation using the fixture unit values for public fixtures, not private fixtures. Hose bibbs have a continuous demand and are to be assigned a GPM demand and added to the demand determined for the plumbing fixtures. Reference: Sections E102.1 and E103.3 (2.1), IPC 2012. 7. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. 8. Provide roof drainage and hydraulic scupper size calculations for the addition based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012. 9. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012. |
12/07/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
12/07/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A-1; CODES: PLEASE ADD THE 2011 NATIONAL ELECTRICAL CODE TO THIS LIST. REMOVE THE 2010 AMERICANS WITH DISABILITIES ACT STANDARDS, AND REPLACE THAT WITH THE 2009 ICC/ANSI A117.1 ACCESSIBILITY CODE. 2. SHEET A-3; DEMOLITION PLAN: THE DOOR BETWEEN THE OFFICE AND THE LIVING AREA HAS A PLAN NOTE 5. PLEASE REVISE THAT NOTE REFERENCE. 3. SHEET A-4; FLOOR PLAN: PLEASE INDICATE ON THE PLAN THE DOOR OPENING BETWEEN THE OFFICE AND THE LIVING AREA IS TO BE INFILLED WITH A ONE HOUR FIRE RESISTANCE RATED WALL ASSEMBLY. 4. SHEET A-4; ELEVATIONS A, B, C, AND D: THE COVE BASE IS INDICATED AS GENERAL NOTE B ON THOSE ELEVATIONS. PLEASE REVISE. 5. SHEET A-4; FLOOR PLAN: PLEASE INDICATE ON THE PLAN THE COUNTER AND SINK AT THE SOUTH END OF THE OFFICE MUST BE A MAXIMUM OF 34" ABOVE FINISH FLOOR. 6. SHEET A-5; EXISTING SOUTH ELEVATION: PLEASE INDICATE THE DOOR AT THE TOILET ROOM ON THIS ELEVATION. 7. SHEET A-5; EXISTING SOUTH ELEVATIOIN (AT BOTTOM OF SHEET): THIS ELEVATION SHOULD BE TITLED THE EAST ELEVATION. PLEASE REVISE. 8. SHEET A-6 (EAST ELEVATION); SHEET A-3 (DEMOLITION PLAN): THE EAST ELEVATION INDICATES THE EXISTING STRUCTURE AT THE NORTH END OF THE NEW WINDOW, WHILE THE DEMOLITION PLAN INDICATES THE EXISTING WALL REMOVED TO A LOCATION JUST SOUTH OF THE DOOR. THE FLOOR PLAN ON SHEET A-4 ALSO INDICATES NEW WALL TO A LOCATION JUST SOUTH OF THE DOOR. PLEASE COORDINATE. 9. SHEET A-7; ACCESSIBILITY MOUNTING HEIGHTS: PLEASE INCLUDE ALL DIMENSIONS ON THIS SHEET FOR GRAB BAR LOCATIONS PER THE ICC/ANSI FIGURES 604.5.1 AND 604.5.2. PLEASE INCLUDE THE VERITCAL GRAB BAR. 10. SHEET A-7; TYPICAL ACCESSIBLE TOILET ROOM PLAN 6: PLEASE REMOVE THIS PLAN AS IT DOES NOT RELATE TO THIS PROJECT. 11. SHEET S-1; DETAIL 3: PLEASE INDICATE THE EXISTING CONSTRUCTION ON THIS DETAIL. 12. SHEET S-1; GENERAL FOUNDATION NOTES: FOR AN ASSUMED SOIL BEARING VALUE OF 1500 PSF, THE BOTTOM OF THE FOOTING MUST EXTEND A MINIMUM OF 18" BELOW FINISH GRADE OR FINISH FLOOR, WHICHEVER IS GREATER. 13. SHEETS S-1 AND S-2; GENERAL NOTES: THESE NOTES ARE APPLICABLE TO THE IRC ONLY. PLEASE REVISE AND PROVIDE STRUCTURAL CALCULATIONS. 14. SHEET S-2; FRAMING PLAN: A SECTION B/A9 IS REFERENCED THROUGH THE SOUTH WALL OF THE ADDITION. PLEASE REVISE THAT REFERENCE. 15. GENERAL: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE VERTICAL AND LATERAL ANALYSIS OF THIS ADDITION. 16. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/13/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The submitted mechanical drawing is incomplete; specify the packaged heat pump to be used for this activity. Reference: Section 107.2.1, IBC 2012. 2. Demonstrate energy code compliance for the addition to the existing building envelope using calculations based on the current code. Reference: Sections C101.3, C101.5, C103.2, C303, and C401.2, International Energy Conservation Code 2012. 3. Show that the proposed replacement rooftop units meet the requirements of Sections C403.2.2, C403.2.3, C403.2, and C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 4. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 5. Verify that the installer setup menu for the specified programmable thermostat includes off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.2.4, IECC 2012. 6. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 7. Provide calculations to show how adequate ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012. 8. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Sections 403.2.1 (4) and 403.3, IMC 2012. 9. Provide an exhaust vent for the clothes dryer. Reference: Section 504, IMC 2012. |
12/21/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide for GFI protected receptacles that are within 6' of the sinks and in the restroom. NEC 210.8B. #2. Identify the 2 exterior luminaires and include them in the luminaire schedule, and provide complete compliance with the TUCSON/PIMA COUNTY OUTDOOR LIGHTING CODE. Can be down loaded from www.tucsonaz.gov/pdsd. #3. Locate the ac unit on the electrical plan, include disconnecting means. Ref: 2012 IBC sec. 107.2.1, 2011NEC, Outdoor Lighting Code. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/23/2017 | PIBARRA1 | APPROVAL SHELF | Completed |