Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T16CM08401
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/20/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
12/20/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Riser 1 now shows both an ASSE 1024 double check valve and an ASSE 1013 RPBP: which device will be installed? [Initial comment: Clarify the type of double check valve assembly that is specified for water connections 1, 2, and 5 (i.e. ASSE Standard number). Reference: Sections 608.1 and 608.3, IPC 2012.] 2. The plumbing plan (P1.1) and detail PSD-7A show the compartment drains combined. [Initial comment: Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012.] |