Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM08046
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/24/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/24/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the rexisting RTU is controlled by a thermostat. Thermostats that are new or are being relocated shall comply with the capabilities required by Section C403.2.4, IECC 2012. 2. Verify that the condensate drain for the RTU terminates in an approved location. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. 3. The City of Tucson has not adopted ASHRAE Standard 62-1 as an approved method for calculating ventilation requirements; use Section 403.3, IMC 2012. |
10/24/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments . Also provide a written response. #1. Provide disconnecting means for the water heaters and the AC units. #2. Indicate conduit, conductor sizes and types for the AC units and water heater circuits. #3. Per the load calc's on the panel schedules for the water heaters, a 20 amp OCPD would be to small, per NEC art. 422.10. Ref: 2012 IBC 107.2.1, 2011 NEC. |
10/24/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/24/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A2; FLOOR PLAN (SUITE 120): NO WATER DISPENSER IS CALLED OUT IN THIS SUITE. PLEASE REVISE. 2. SHEET A2; ELEVATION 3: PLEASE PROVIDE A DIMENSION FROM THE CENTERLINE OF THE WATER CLOSET TO THE END OF THE HORIZONTAL GRAB BAR PER THE ICC/ANSI FIGURE 604.5.2. 3. SHEET A2; ELEVATION 3: PLEASE PROVIDE A DIMENSION FROM THE BACK WALL TO THE CENTERLINE OF THE VERTICAL GRAB BAR PER THE ICC/ANSI FIGURE 604.5.1. 4. SHEET A3; DETAILS 4 AND 6: THE METAL FLOOR STUDS FOR THE WATER HEATER SHELF SHOWN IN DETAIL 6 DO NOT SHOW UP ON DETAIL 4. PLEASE ADD. 5. SHEET A3; DETAIL 2: NEW WALL STUDS ARE TYPICALLY INDICATED ON THIS PROJECT AS 3-5/8" X 22 GA., BUT THE WALL STUDS INDICATE 20 GA. ON DETAIL 2. PLEASE CLARIFY. 6. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
10/24/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an approved vacuum relief valve for the scheduled bottom-fed water heater which is located above the fixture outlets. Reference: Section 504.2, IPC 2012. 2. Provide a drain (minimum ¾") from the pan located below the water heater to an approved location. Reference: Section 504.7, IPC 2012. |
10/25/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/26/2016 | LBOJORQ1 | ZONING | REVIEW | Needs Review | |
10/26/2016 | LBOJORQ1 | ENGINEERING | REVIEW | Needs Review |