Permit Number: T16CM07902
Parcel: 137055380

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T16CM07902
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/01/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed; third request. Revise the structural calculations for the support of kitchen hoods KH-2 and KH-3 to include the hood hanging weight plus the weight of personnel working in or on the hood. Provide structural details to show how the Type I hoods are supported from the building structure in accordance with Section 507.6, IMC 2012. Reference: Section 302.1, IMC 2012.
2. Comment not addressed; third request. Provide structural details showing how the roof structure is to be modified for the installation of HP-5. Reference: Section 302.1, IMC 2012.
3. Revise keynote 12 to call for 3 duct connections from HP-4 to KH-3 as shown on the mechanical plan (the keynote currently calls for 5 connections at 100 CFM each). [Initial comment: Coordinate the balancing data for the hoods KH-1 and KH-3. The scheduled amount of AC supply air is different than the AC supply air noted in keynotes 12 and 13. Reference: Section 107.2.1, IBC 2012.]
4. The use of the default U-factor and SHGC values of Section C303.1.3, IECC 2012 will not necessarily provide compliance with the code for alteration of a building. Provide an Envelope Compliance Certificate (i.e. COMcheck) that shows that the proposed changes comply with the code requirements. [Initial comment: Specify the required U-factors and Solar Heat Gain Coefficients (SHGC) for the new fenestration and doors on the architectural drawings to verify compliance with the energy code. Reference: Section C103.2, IECC 2012.]