Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T16CM07773
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/21/2016 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
11/30/2016 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | T16CM07773 - PLAN REVIEW COMMENTS - 2nd REVIEW Reviewer: Christopher Anderson, November 29, 2016 BUILDING - COMMERCIAL 1. In response to previous building comments 1 and 6, this project cannot be approved before approval of the development plan and your Petition of Appeal to the Building Official regarding common restroom facilities and remotely located service sink. 2. Regarding previous building comment 3, your response indicates that you intend to fill in the existing 6'-0" wide opening in the demising wall "as necessary per future tenant improvements when circumstances require it." Fire rated protection shall not be deferred to a future permit. This opening must be fire-protected per previous comment 3 as part of this permit. 3. Regarding previous building comment 8, the new RTU will weigh 675 pounds according to the revised heat pump schedule. Proof by structural calculations must be submitted showing that the existing roof structure will support this unit in the shown location and orientation without modification. |
11/30/2016 | PIMA COUNTY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | MECHANICAL - COMMERCIAL 1. In response to previous mechanical comments 1 and 2, the mechanical heating and cooling calculations added to sheet m2.0 show the design OA temperature as 100.5 degrees F. This is not the Tucson summer design temperature which is 104 degrees F. 2. Also in response to previous mechanical comments 1 and 2, the combined sensible loads for the selected and existing equipment (85,200 btuh/65,500 btuh) exceeds the calculated sensible loads for both cooling and heating for this space (77,263 btuh/50,116 btuh). Per 2012 IECC C403.2.1 "the output capacity shall not exceed the loads calculated in accordance with C403.2.1. A single piece of equipment providing both heating and cooling shall satisfy the provision for one function with the capacity for the other function as small as possible, within available equipment options." |
11/30/2016 | PIMA COUNTY | ELECTRICAL-COMMERCIAL | REVIEW | Completed | |
11/30/2016 | PIMA COUNTY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | PLUMBING - COMMERCIAL 1. In response to previous plumbing comments 1 and 2, show the plumbing for the new service sink on the plumbing plan and isometric. Neither has been updated showing the new line. All laterals to fixtures should be marked (E) as they were installed with the previous underground plumbing permit; however the service sink is new to this permit. Clearly show the piping to it on the plan and isometric and label it (N). |
12/14/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: T16CM07773 7th Street Tap Building Plan (2nd Review) TRANSMITTAL DATE: December 14, 2016 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Until development package, DP16-0196, has been approved the building plan cannot be approved. 3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
12/19/2016 | ROBERT SHERRY | WATER | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/19/2016 | PIBARRA1 | APPROVAL SHELF | Completed |
12/19/2016 | PIBARRA1 | OUT TO CUSTOMER | Completed |
12/19/2016 | PIBARRA1 | REJECT SHELF | Completed |