Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM07754
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/18/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/18/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
11/18/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the water pressure calculations - see Appendix E, IPC 2012 for instructions. Include the pressure drop for a backflow preventer if one will be installed. [Initial comment: Revise the water demand calculation using the fixture unit values for public fixtures, not private fixtures. Verify the existing water service pipe from the meter to the building is adequate for the new demand. Reference: Sections E102.1 and E103.3 (2.1), IPC 2012. 2. Comment not resolved, the plumbing plan and the riser diagram are still not coordinated. [Initial comment: Coordinate the water riser diagram and the waste and vent diagram with the plumbing plan. Reference: Section 107.2.1IBC 2012.] |
11/18/2016 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | The backflow preventer shown on the drawing and in the photographs is a pressure vacuum breaker and is typically used for irrigation systems. Contact Tucson Water (Backflow Protection, 791-2650) to determine if a reduced pressure backflow preventer will be required for this building. [Initial comment: Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf..] |
12/13/2016 | ARUIZ1 | ZONING | REVIEW | Needs Review | |
12/13/2016 | ARUIZ1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |