Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T16CM07698
Parcel: 11615088L

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T16CM07698
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/10/2016 STEVE SHIELDS ZONING REVIEW Approved
10/10/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
10/10/2016 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/10/2016 ROBERT SHERRY WATER REVIEW Completed
10/10/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET g1.0 (CODE INFORMATION); SHEET g1.2 (CODE REVIEW): THE CONSTRUCTION TYPE IS INDICATED AS II-B ON SHEET g1.0 AND I-B ON SHEET g1.2. PLEASE COORDINATE.
2. SHEET g1.2: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE DIMENSION ON THE EGRESS FLOOR PLAN.
3. SHEET a1.0: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE REFERENCE FLOOR PLAN ROOM IDENTIFICATIONS.
4. SHEET a2.0; KEYNOTES: MANY OF THE NOTES ARE RELEVANT TO THE PLANS ON SHEET a2.1 ONLY. PLEASE REMOVE THOSE NOTES FROM THIS SHEET.
5. SHEETS a2.0 AND a2.1; PLANS: THE MD ROOM EAST OF RESTROOM 1556 IS EDENTIFIED AS 1556. PLEASE VERIFY.
6. SHEET a2.1; KEYNOTES: ON NOTES 10 AND 11, PLEASE INDICATE THE STUD SPACING IN THE NEW WALLS.
7. SHEET a2.1; KEYNOTES: MANY OF THE NOTES ARE RELEVANT TO THE PLANS ON SHEET a2.0 ONLY. PLEASE REMOVE THOSE NOTES FROM THIS SHEET.
8. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
10/10/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
10/10/2016 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/11/2016 KEN BROUILLETTE FIRE REVIEW Reqs Change Need the type of construction clarified. See building review comment
10/31/2016 LBOJORQ1 ENGINEERING REVIEW Needs Review