Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T16CM06498
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2016 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | Still waiting for building issues to get resolved-kenb |
08/29/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | All vents (except for vents serving interceptors located outdoors) shall rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012. [Initial comment: Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.9, IPC 2012.] |
08/29/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A2; EXITING: IF ONLY ONE EXIT IS PROVIDED (PER RESPONSE TO PREVIOUS COMMENT 3), THE COMMON PATH OF EGRESS TRAVEL MUST MEET THE DISTANCES INDICATED IN THE IBC TABLE 1014.3 (MAXIMUM 75 FEET). PLEASE INDICATE ON THE PLAN THE COMMON PATH OF EGRESS TRAVEL (MEASURED PER IBC SECTION 1016.3) MEETS THE TABLE REQUIREMENTS. 2. PREVIOUS COMMENT 4: PLEASE INCLUDE THE STRUCTURAL MODIFICATION ON THE FULL SIZE DRAWINGS. 3. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
08/29/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |