Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T16CM06421
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/25/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Reqs Change | DATE: November 25, 2016 DUE DATE: December 7, 2016 SUBJECT: Cell Tower TO: Chris Siino - Siino Design LOCATION: Roadway Median south of the corner of Waverly Street and Tucson Blvd REVIEWERS: Paul Baughman, PE, CFM ACTIVITY: T16CM06421 and T16OT 01001 SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed: 1) Per previous comment 1 and Tucson Code Chapter 26-8(b)2d "The proposed floodplain management methods for floodproofing (existing nonresidential structure only) drainage control, detention, retention, and/or delineating and setting aside floodprone areas which result in mitigating a flood or erosion hazard on the proposed finished pads (elevations determined) and drainage slopes constructed to protect building foundations from runoff waters." Equipment pad needs to be shown elevated at least one foot above the floodplain 100 year water surface elevation. Alternatively the floodproofing method needs to be clear shown that protects the proposed equipment from flood waters. Please update the cabinet concrete slab detail 2 on sheet A-4 to indicate the appropriate elevation or floodproofing measures provided. An elevation certificate will be required if the slab/pad is to be elevated. 2) Per previous comment 2, the cabinet concrete slab detail is scaled to be about 45 feet south of the existing edge of centerline curb. If this is the case the Regulatory Base Flood Elevation that the slab must be elevated to is 2436.45. This is about 2 ½ feet higher than the adjacent natural grade called out on sheet LS-1. Please update plan accordingly. If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov. |
| 11/29/2016 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Provide requested plan pages per previous comment: "Provide full-sized sealed drawings of the tower and foundation construction drawings as shown in the structural calculations (i.e. pole geometry, pole details, and foundation detail)." |
| 12/06/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/19/2017 | ARUIZ1 | OUT TO CUSTOMER | Completed |