Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/WWM
Permit Number - T16CM06378
Review Name: RESIDENTIAL - BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2016 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T16CM06378 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS: 1. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½"control conduit and two ¾" copper piping for water with rooftop termination; straight 3" capped sleeve; or an accessible attic (clear path 30" wide x 30" high) over the water heater. Show appropriate notation. 2. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Provide a gray drain-line discharge of all second story bathing fixtures through an exterior-wall drop for future gravity distribution. Include an aliened purple colored 2" vertical drop to a cleanout cap 2' above grade. See the PDSD web site for standard details. FLOOR PLANS: 1. Show a maximum ½" floor elevation change at a notated accessible route entrance on the floor plan, R106.1.1. STRUCTURAL PLANS: 1. Show a beam size at with appropriate load carrying capacity, R301.1. The north upper floor wall requires load bearing (Braced Wall) fastening to the top of first floor framing. Consider a foundation below a portion of this wall line. 2. Provide a header schedule and show opening sizes supporting new roof consistent with Table 502.5(1) & (2). 3. Show garage opening narrow panels with fastening details using a prescriptive method at Figure R602.10.6.2, R602.10.6.3 or R602.10.6.4. ELEVATIONS: 1. Clarify the location of ceiling insulation (remove conflicting locations), R301.1. Update Section B and keynote #8, sheet 5. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing (closed cell spray or rigid board tight to the roof sheathing), R806.5. This condensation control provision is necessary for code compliance, and may be a single layer of air-impermeable insulation, or layered with batt insulation for achieving the total required roof R-value. 2. If a vented roof assembly method will be utilized then provide an attic space ventilation calculation and specify size and location of all vents needed to comply with R806.2. Provide appropriate upper and lower space vents if applying the reduced area calculation per exception requirements. SECTIONS - DETAILS - NOTES: 1. Clarify the location (alignment) of the upper level large window at the north view, sheet 4, R106.1.1. The plan shows the window over the front door and partially under the roof gable structure. PLUMBING PLANS: 1. Show compliance with the general comments. MECHANICAL PLANS: 1. Provide (an HVAC system with) whole-house mechanical ventilation with continuous or a minimum controlled intermittent airflow rate, R303.4 & M1507.3. Show a source of outside supply air or continuous exhaust fan function. 2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical system calculations may be provided by deferred submittal. The deferred calculations must be approved through revision process prior to mechanical inspections. 3. Provide return air duct and register sizes meeting minimum requirements of 72 SQ IN/ ton, M1403. Minimum duct/register size: heat pump or air conditioner - 6 SQ IN per 1,000 BTU (1 ton cooling = 12,000 BTU). 4. Show dryer vent size and location for venting to exterior, M1501. ELECTRICAL PLANS: 1. Show locations of each smoke alarm, R314. Notate that all smoke alarms must be interconnected with a power source from the building wiring, and be equipped with battery backup. 2. Smoke alarms are not only required outside of bedrooms, but also show a smoke alarm on each story of the dwelling, R314.3.3. 3. Show receptacle outlets at wall spaces 2' or more with no wall point (exclude door openings) more than 6' from a receptacle outlet, E3901.2. Add receptacle outlets in the bedroom over the Master Bedroom. 4. Show Bathroom receptacles on a separate 20 AMP circuit (dedicated) with outlets at no other location, E3703.4. Place the outdoor receptacles on a different circuit. 5. Show or notate a disconnect means or a locking breaker for the water heater, E4101.5. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/19/2016 | PIBARRA1 | APPROVAL SHELF | Completed |
| 12/19/2016 | PIBARRA1 | OUT TO CUSTOMER | Completed |
| 12/19/2016 | PIBARRA1 | REJECT SHELF | Completed |