Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T16CM05704
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/12/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comment. Also provide a written response. #1. As per the last plan review comment #2," VERIFY THE 75 KVA TRANSFORMER LOCATION AND COMPLIANCE WITH NEC ART.450.13(B)". There was no clarification on the electrical plan as to the exact location of the transformer or compliance with NEC art. 450.13(B), other than the note on plan sheet A2.0,"UNDER ROOF". Per NEC 450.13(B) a 75 KVA transformer would not be allowed to be installed in a "Hollow Space" even with ventilation. Also the locations for the transformer and the exhaust fan conflict each other between plan sheet A2.0 and E2.0. If the transformer is to be suspended from the roof or building structure, a structural review will be required along with load calc's and mounting details. #2. Also be advised, if the transformer is located more than 25' from panel 'A', disconnecting means and overcurrent protection for the secondary conductors will need to be provided as required per NEC art 240.21. Ref: 2012 IBC sec. 107.2.1, 2011 NEC. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/19/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |