Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM05476
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/14/2016 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
07/14/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
07/15/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide complete compliance with the 2012 IECC for interior lighting. |
07/15/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Show how the new area will be provided with ventilation since there is no return air for the HVAC system in that room. |
07/15/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1.0: PLEASE PROVIDE A DETAIL ON THIS SHEET INDICATING HOW THE NEW PARTITION WALL IS BRACED AT THE TOP TO RESIST THE LOADS REQUIRED BY THE IBC SECTION 1607.14. INCLUDE BRACING SIZE AND SPACING, CONNECTION TO THE TOP OF THE PARTITION WALL, AND CONNECTION TO THE EXISTING STRUCTURE ABOVE (INCLUDE CONNECTOR SIZE AND QUANTITY). |
07/15/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/15/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
07/15/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/18/2016 | KEN BROUILLETTE | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/20/2016 | ARUIZ1 | OUT TO CUSTOMER | Completed |