Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 3RD
Permit Number - T16CM04943
Review Name: REVISION - - 3RD
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/18/2018 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/23/2018 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Many sheets (architectural and structural) noted on the Index to Drawings (Sheet A0.0) are not included in this submittal. Are the missing sheets those that were stamped as approved by the City of Tucson, and no further changes were made? Please verify. If this submittal set contains all drawings that require approval for building and structural, you may come in any day during open counter (8:00 to 9:30), and the drawings will be approved. Please call Eric Newcomb at 520-837-4911 to verify when that will occur. |
01/26/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Plumbing plan 1/P1.3 shows WH-2 in room 108A but plumbing plan 2/P1.3 shows WH-1 in room 108A. [Initial Comment: Sheet P1.3: Clarify which water heater is located in room 108A - WH-1 or WH-2. Why isn't the water heater shown in water isometric C/P2.0? Reference: section 107.2.1, IBC 2012.] |
01/26/2018 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide sheet M1.9; it calls out sections in three locations on sheet M1.1. |
01/26/2018 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: Casa De los NiƱos T16CM04943 Building Plan (3rd Revision) TRANSMITTAL DATE: January 26, 2018 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the revisions and while the changes made do not affect zoning requirements the revision plan set cannot be approved until all the Commercial Plans Reviewers have reviewed and approved the revised plan set. 3. Zoning will review the plan set on the next submittal and approve the plans if all Commercial Plans Reviewers have approved the plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/14/2018 | QJONES1 | APPROVAL SHELF | Completed |
02/14/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
02/14/2018 | QJONES1 | REJECT SHELF | Completed |