Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T16CM04843
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/19/2016 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
09/22/2016 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Rivera for Steve Shields - Principal Planner PDSD Zoning Review Section PROJECT: New Green House - 6525 E. Littletown Road Building Plan Package (1st Review) T16CM04843 (Related to DP16-0162) TRANSMITTAL DATE: September 22, 2016 DUE DATE: September 30, 2016 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for the proposed green house building. As of this review the DP16-0162 has not been reviewed for compliance and therefore zoning cannot approve the building plans at this time. 2. COMMENT: Zoning will review the building plans on the next submittal and compare it to the approved DP16-0152 to ensure building plans are within substantial compliance with the approved DP. 3. COMMENT: Also, it is not clear if the proposed expansion has been reviewed for compliance with the MM setback requirements for the expansion. Contact Carolyn Laurie 837-4953 for more information on the MM review and approval process. If the MM review and approval has been done for the expansion, provide a copy of the approval letter with the next submittal. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: (Revised building plan package) |
09/30/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET 01: PLEASE PROVIDE A CODE ANALYSIS ON THIS SHEET FOR THE GREENHOUSE STRUCTURE, INCLUDING THE OCCUPANCY TYPE, CONSTRUCTION TYPE, OCCUPANT LOAD, ALLOWABLE SQUARE FOOTAGE (SHOW CALCULATIONS PER THE IBC SECTION 506 IF IT APPLIES-OTHERWISE USE TABLE 503), ACTUAL SQUARE FOOTAGE, CODES USED, ETC. 2. SHEET 01: PLEASE INCLUDE A NOTE ON THIS SHEET THAT THE GREENHOUSE MANUFACTURER (AIRSTREAM INNOVATIONS) WILL PROVIDE THE CONCRETE DESIGN STRENGTH REQUIRED FOR THE FOOTING SHOWN (ON DRAWING A-3), THE STRENGTH OF THE REINFORCING BARS IN THE FOOTING (IF REQUIRED), THE ALLOWABLE SOIL BEARING PRESSURE, AND THE DESIGN WIND SPEED AND EXPOSURE. MANY OF THESE ARE IN THE STRUCTURAL CALCULATIONS, BUT NEED TO BE LISTED ON THE DRAWINGS. 3. AIRSTREAM INNOVATIONS DRAWINGS: PLEASE PROVIDE A PLAN IN THE DRAWINGS INDICATING THE LOCATION AND EXTENT OF THE ANCHOR SYSTEM (AS SHOWN ON A-1), THE LOCATION AND EXTENT OF THE MR3 ANCHORS (AS SHOWN ON A-2), AND THE LOCATION AND EXTENT OF THE FULL TOWER ASSEMBLIES (AS SHOWN ON A-3). 4. AIRSTREAM INNOVATIONS DRAWINGS: PLEASE PROVIDE ON THE PLAN THE SECTION/DETAIL CUTS FOR ALL THE BUILDING COMPONENTS AS INDICATED ON THE DRAWINGS IN THIS SUBMITTAL (SEE COMMENT 3). 5. GENERAL: PLEASE PROVIDE TWO SETS OF STRUCTURAL CALCULATIONS. 6. GENERAL: PLEASE FOLLOW THE REQUIREMENTS OF THE IBC SECTION 107.3.4.1 FOR DEFERRED SUBMITTALS. 7. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/25/2016 | AHINES2 | OUT TO CUSTOMER | Completed |