Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM04628
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/14/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | P&DS TRANSMITTAL FROM: Steve Shields, Principal Planner PROJECT: T16CM04628 178 E. Broadway Blvd. New Food Service TRANSMITTAL: June 14, 2016 COMMENTS: the following comments are relative to an application for Design Review Board (DRB), project is located within the Downtown Core Subdistrict (DCS) 5.12.10, Rio Nuevo Area (RNA) 5.12.7 This site is located in the C-3 zone (UDC 4.7.22). A food service is a permitted use in this zone (Table 4.8-4). Proposed project add outdoor seating and modify front facada. The DRB review will need to be completed and approved prior to approval of the building plans. If the DRB review is approved provide the historic case number in the lower right hand corner of the plot plan and if applicable provide a general note that provides the historic case number date of approval, and any conditions of approval. |
10/13/2016 | TWEIDEM1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
10/13/2016 | TWEIDEM1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
10/13/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Needs Review | Approval to submit given instead of approval due to outside addition of accessability ramp. Engineering will follow the lead of zoning on development package requirement, if applicable. |
10/13/2016 | TWEIDEM1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
10/13/2016 | ARUIZ1 | WATER | REVIEW | Needs Review | |
10/13/2016 | TWEIDEM1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
10/13/2016 | TWEIDEM1 | FIRE | REVIEW | Needs Review | |
10/13/2016 | ARUIZ1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |