Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T16CM04074
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/10/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | PLEASE REVISE THE INDEX OF DRAWINGS ON SHEET A1.1 DUE TO THE ADDITION OF SHEETS A9.2 AND A9.3. |
06/10/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Insulation is required on the first 8-feet of both the supply (CW) and discharge (HW) piping. [Initial comment: If the specified water heater is not supplied with integral heat traps, provide 0.5" of insulation with a maximum conductivity of 0.27 BTU per inch/h F on the first 8 feet of supply and discharge piping. Reference: Section C404.5, IECC 2012.] |