Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T16CM04068
Parcel: 12701005D

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T16CM04068
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/01/2016 ANDREW CONNOR ZONING REVIEW Approved
06/01/2016 LOREN MAKUS ENGINEERING REVIEW Approved
06/01/2016 KEN BROUILLETTE FIRE REVIEW Approved
06/02/2016 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
06/02/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A1.0; DEMOLITION PLAN KEYNOTES: NOTE 3 REFERENCES 3/A1 FOR HORIZONTAL MEASUREMENTS. PLEASE REVISE THE DETAIL REFERENCE.
2. SHEET A1.0; DETAIL 5: IS THIS A FIRE PARTITION (PER THE IBC SECTION 708)? PLEASE INDICATE REQUIREMENTS AND ADD A U.L LISTING NUMBER FOR THAT ASSEMBLY.
3. GENERAL: IS A CERTIFICATE OF OCCUPANCY BEING REQUESTED FOR THIS? PLEASE INDICATE AN OCCUPANT LOAD AND SQUARE FOOTAGE FOR THIS SPACE.
4. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
06/02/2016 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/06/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Clarify the HVAC will be balanced: the ventilation calculations require 20 CFM of outside air but 200 CFM of outside air is being supplied to the space . How will the additional air be relieved from the space?
2. Are there any appliances being installed in the space that will require exhaust per Section 507.2.2, IMC 2012?
3. Provide structural calculations and details showing how the fan coil will be attcahed to the building structure.
4. Provide cooling/heating load calculations for the new fan coil unit and show that the fan coil and heat pump comply with the 2012 IECC.
06/06/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide a list of appliances that will be directly connected to the water distribution system and specify the backflow prevention devices that will be required for each connection.
2. Show how fats, oils, and grease will be prevented from discharging to the public sewer system.
06/06/2016 ROBERT SHERRY WATER REVIEW Completed