Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: REVISION - - 3RD
Permit Number - T16CM03742
Review Name: REVISION - - 3RD
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/05/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/05/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a plumbing design showing the work to be accomplished. Include the required increase in exhaust for the modified restroom/shower areas. |
05/05/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide the following information on tha plans. #1. Denote all the electrical equipment that is existing. New electrical equipment and devices, lighting, need to have assigned branch circuits and panel designations. #2. Provide a complete panel schedule include load calcs. #3. Provide a complete lighting schedule and compliance with the 2012 IECC if applicable. Ref: 2012 IBC sec. 107.2.1, 2011 NEC. |
05/05/2017 | ANY | ZONING | REVIEW | Active |