Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T16CM03008
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/08/2016 | ANDREW CONNOR | ZONING | REVIEW | Approved | |
| 06/08/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The sequence of operation for exhaust fans EF-9, 10, 12, and 14 still need to be addressed. [Initial comment: Revise the sequence of operation for the restroom exhaust fans (EF-1, 2, 3, 5, 7, 8, 9, 10, 12, 14) so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012.] 2. Comment not addressed. [Initial comment: Demonstrate energy code compliance for the alterations to the building envelope (e.g. the new glazing) based on the current code. Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012.] 3. Comment not addressed. [Initial comment: Show that the proposed HVAC system meets the requirements of Sections C403.2, C403.3, IECC 2012 (e.g. provide the mechanical code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012.] |
| 06/08/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide full compliance with the Tucson Outdoor Lighting Code utilizing the 'SB' luminaires. Plan luminaire schedule shows them as uplights in a non totally enclosed arched roof. |
| 06/08/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/08/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A101; PREVIOUS COMMENT 11: IN THE PARTITION SCHEDULE, PLEASE INDICATE A ONE HOUR FIRE PARTITION. IN ADDITION, INDICATE THE U.L. LISTING NUMBER FOR THAT PARTITION ASSEMBLY. 2. SHEET G002: UNDER THE BUILDING HEIGHTS AND AREAS, PLEASE INDICATE THE ALLOWABLE AREA INCREASE PER THE IBC SECTION 506 ON THE DRAWING. INDICATE 9000 SF (300%) + 9000 = 36,000 SF ALLOWABLE. 3. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 06/08/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Relocate the shut off valve and check valve on the cold water line to a point upstream of the hot water return connection. [Initial comment: Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, safety pan, and valves. Reference: Sections 503, 504, 606.1, and 607.3, IPC 2012.] 2. Comment not addressed. [Initial comment: Specify the type of backflow prevention device required for the two irrigation outlets. Reference: Sections 608.1 and 608.3, IPC 2012.] 3. Correct the size of the gas pipe along the 70' branch to 1-1/4". [Initial comment: Revise the size of the natural gas pipe serving AC-1 and AC-2 (1" pipe @250' is limited to 119 CFH) per Table 402.4 (2). Reference: Section 402.4, IFGC 2012.] |