Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T16CM02480
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/07/2016 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | Plans need to indicate a fire alarm system, will continue review while waiting for revisions-kenb |
| 04/18/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Needs Review | Development Package must be approved first. |
| 04/22/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principal Planner PROJECT: Mainstreet T16CM02480 Building Plan (1st Review) TRANSMITTAL DATE: April 22, 2016 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the building plan for compliance to development package DP16-0049 but until the development package has been approved Zoning cannot approve the building plan. 3. The development packages sheets provided in the building plans will either need to be the approved development package sheets or marked as reference or removed from the building plans. 4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 04/27/2016 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. [Note: The site utility plan submitted with this activity is not the current version of the site utility plan.] Reduced pressure backflow prevention assemblies are required to be installed directly after the domestic water meter for buildings that have food service facilities or licensed personal care facilities). Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf 2. Provide the calculations used to determine the total demand that the 2" water meter will be serving. Include all fixtures when calculating the total demand. Reference: Section 604.3, IPC 2012. |
| 04/28/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide complete compliance with the Tucson/Pima County Outdoor Lighting Code for exterior illumination. #2. Provide a fault current analysis for the Electrical Service and associated equipment. #3. (a).Provide for a selective coordination analysis for circuit paths required by NEC arts. 517, 700, 701, 708, to be submitted to the AHJ . (b).Provide for installation of warning labels as required per NEC arts. 700-708. #4. Provide Ground fault protection for all 120 volt receptacles in the kitchen and or food prep areas as required per NEC art. 210.8B. #5. Provide for Tamper Resistant receptacles in the resident rooms where applicable per NEC art. 406.2, 406.12. #6. Wiring methods in exam rooms or patient care areas to comply with Nec art. 517. #7. Panel schedules circuiting needs to be more descriptive as to the load served, especially for the resident units. Also the HVAC circuits designated for the resident units do not correlate with the panel schedules. Ref: 2012 IBC 107.2.1, 2011 NEC, City of Tucson Commercial Plan Submittal Requirements. |
| 04/28/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. Correct the expiration date for the current registration. 2. Provide a list of the abbreviations used on the drawings (e.g. FFA. TFA, etc). Reference: Section 107.2.1, IBC 2012. 3. Replot the plumbing details so they are legible. Reference: Section 107.2.1, IBC 2012. 4. Lined water heaters with a heat input of 200,000 BTU per hour or more, an operating water temperature of 210º F or greater, or a nominal water containing capacity of 120 gallons or more are required to comply with the rules contained in Article 4 (Arizona Boilers and Lined Hot Water Heaters) of the Arizona Administrative Code. 5. Provide fixture descriptions for all plumbing fixtures. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012. 6. Label each plumbing fixture on the plumbing plans. Reference: Section 107.2.1, IBC 2012. 7. Complete the plumbing plans and the waste and vent isometrics. Reference: Section 107.2.1, IBC 2012. 8. Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2012. 9. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012. 10. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. Reference: Section 604.9, IPC 2012. 11. Appliances (e.g. soda dispensers, ice makers, etc) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.13.1, IPC 2012 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 608.1 and 608.3, IPC 2012. 12. Coordinate the waste and vent design with the civil plans; the building sewer is 6", not 8". Reference: Section 706.2, IPC 2012. 13. Provide cleanouts for all horizontal drains; the cleanouts shall not be located greater than 100-feet apart, measured from the upstream entrance of the cleanout. Reference: Section 708.3.1, IPC 2012. 14. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 709.1, IPC 2006. Include the total number of each fixture being installed. Reference: Section 710, IPC 2012. 15. Provide separate indirect waste pipes for each compartment of the 3-compartment sink to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.8, IPC 2012. 16. Provide roof drainage calculations and plans. Provide overflow protection for the roof. Reference: Sections 1101, 1106 and 1108, IPC 2012. 17. Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping. Reference: Section 107.2.1, IBC 2012. |
| 05/02/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. Correct the expiration date for the current registration. 2. Provide the day, month, and year of the expiration of current registration for the seal on the food service drawings. Reference: Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration 3. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 4. Provide NFRC fenestration product ratings for the Solar Heat Gain Coefficient (SHGC) on COMcheck or use the appropriate default SHGC from Table C303.1.3 (2), IECC 2012. Coordinate the SHGC values shown on the COMcheck Envelope Compliance Certificate with the window descriptions shown on the drawings. Reference: Section C303.1.3, IEC 2012. 5. Show how the requirements of Section C406, IECC 2012 (Additional Efficiency Package Options) are to be fulfilled. Reference: Section C401.2, IECC 2012. 6. Show that the proposed HVAC system meets the requirements of Sections C403.2, C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012. 7. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 8. Complete the equipment schedules. Reference: Section 107.2.1, IBC 2012. 9. Provide the installed weight of the rooftop equipment. Reference: Section 302.1, IMC 2012. 10. Provide calculations demonstrating adequate ventilation using the current code. Reference: Section 403.2, IMC 2012. 11. Clarify how exhaust from the spaces for which footnotes b and g of Table 403.3, IMC 2012 apply are either not recirculated to other spaces or no more than 10% of the subsequent supply air is composed of the exhaust air. Reference: Section 403.2.1, IMC 2012. 12. Verify that the commercial dryers have adequate makeup air per the manufacturer's installation instructions. Reference: Sections 304.1 and 504.5, IMC 2012. 13. Provide backdraft dampers for the terminations of the dryer exhaust vents. Reference: Section 504.4, IMC 2012. 14. Show how the dryer installation in room B105 complies with Section 504.5, IMC 2012. 15. Verify that hood K17 Left is listed for use with heavy-duty appliances. Reference: Sections 202 (Heavy-duty cooking appliance) and 507.1, IMC 2012. 16. Provide general room exhaust for any cooking appliance that does not require the installation of a Type II hood. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual appliance. Reference: Section 507.2.2, IMC 2012. 17. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012. 18. Show how and where the refrigerant isolation system isolation valves will be located to limit the amount of refrigerant that can escape to institutional occupancies as defined by Section 1103.2, IMC 2012 (e.g. per sheet M503, the location and number of isolation valves is to be "determined by the engineer"). |
| 05/03/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET COVER: THIS SHEET INDICATES THESE ARE 95% CDS. A FULL REVIEW OF THE SHEETS SUBMITTED WILL BE COMPLETED AT THIS TIME BY THE CITY OF TUCSON. ANY CHANGES TO THE DRAWINGS THAT WERE NOT INCLUDED IN THIS 95% SET WILL BE LISTED BY THE ARCHITECT ON A SEPARATE 8 ½ X 11, SPECIFICALLY INDICATING CHANGES, ADDITIONS, SHEET NUMBERS, AND WHAT THE CHANGE AFFECTS ON THE DRAWING. REVISIONS TO COMMENTS FROM THIS CURRENT REVIEW WILL BE CLOUDED AND CLARIFIED IN A WRITTEN REVISION LETTER SEPARATE FROM THE COMMENTS OF THE CHANGES DUE TO AN INCOMPLETE SUBMITTAL SET. 2. SHEETS G-001, G-002, G-003, AND G-004; FLOOR PLANS: THE PLANS INDICATE ONLY BUILDINGS A AND B, WHILE THE DRAWING INDEX INDICATES A BUILDING C PORTION. PLEASE COORDINATE. WILL THIS DICTATE ANOTHER IMAGINARY LOT LINE AND FIRE RESISTANCE RATED WALL TO SEPARATE BUILDINGS (SEE SHEET G-002)? PLEASE VERIFY. 3. SHEETS G-001, G-002, G-003, AND G-004; FLOOR PLANS: PLEASE INCLUDE THE GRID LINE SYSTEM ON THESE PLANS AS SHOWN ON SHEET AF101. 4. SHEETS G-001, G-002, G-003, AND G-004: PLEASE PROVIDE A NORTH ARROW ON ALL PLANS. 5. SHEETS G-001, G-002 AND G-003; FLOOR PLANS: WHAT DO THE RED LINES AT INTERIOR WALLS INDICATE? PLEASE ADD A REFERENCE FOR THESE ON THOSE SHEETS. 6. SHEETS G-002 AND G-003; FIRE RESISTANCE TABLE: ARE ALL OF THESE TYPES OF WALLS USED ON THIS PROJECT? PLEASE CLARIFY ON A PLAN WHERE THESE WALLS OCCUR. INDICATE ON A PLAN ALL WALLS THAT REQUIRE A FIRE RESISTANCE OR SMOKE RESISTANCE RATING, AND IDENTIFY THOSE RATING REQUIREMENTS ALONG WITH THE WALL SYSTEM REFERENCE. 7. SHEETS G-002 AND G-003; FIRE RESISTANCE TABLE: PLEASE INDICATE ON THESE SHEETS THE REQUIREMENTS OF THE IBC SECTION 407.2.1 (FOR WAITING AND SIMILAR AREAS), SECTION 407.2.2 (FOR CARE PROVIDER'S STATIONS), SECTION 407.2.3 (FOR PSYCHIATRIC TREATMENT AREAS), AND SECTION 407.2.4 (FOR GIFT SHOPS) ARE MET FOR SEPARATION FROM CORRIDORS. 8. SHEETS G-002 AND G-003; FIRE RESISTANCE TABLE: PLEASE INDICATE ON THESE SHEETS THE REQUIREMENTS OF THE IBC SECTIONS 407.7 (FOR FIRE ALARM SYSTEM) AND 407.8 (FOR AUTOMATIC FIRE DETECTION) ARE MET. 9. SHEETS G-002 AND G-003; FIRE RESISTANCE TABLE: PLEASE INDICATE ON THESE SHEETS THE REQUIREMENTS OF THE IBC SECTIONS 710.4 (FOR CONTINUITY), SECTION 710.5 (FOR OPENINGS), SECTION 710.6 (FOR PENETRATIONS), SECTION 710.7 (FOR JOINTS), AND SECTION 710.8 (FOR DUCTS) ARE MET FOR THE SMOKE PARTITIONS. 10. SHEETS G-002 AND G-003; CODE INFORMATION: PLEASE REMOVE THE REFERENCE TO THE 2010 ADA AND REPLACE IT WITH THE 2009 ICC/ANSI A117.1. 11. SHEET G-004; FLOOR PLAN: PLEASE VERIFY THE SMOKE COMPARTMENTS SQUARE FOOTAGE AS LISTED. 12. SHEET G-004; FLOOR PLAN: PLEASE INDICATE IN SMOKE COMPARTMENT 3 (THE LOWER PORTION) THAT THE TRAVEL DISTANCE PER THE IBC SECTION 407.5 MEETS THOSE REQUIRMENTS. NONE IS INDICATED. 13. SHEETS A-005 AND A-006: PLEASE INDICATE ON A PLAN WHERE EACH OF THESE WALL TYPES OCCURS. THE FLOOR PLANS ON SHEETS G-002, G-003, AND G-004 CONTAIN ROOM NUMBERS THAT ARE TOO SMALL TO READ FOR A REFERENCE TO THE WALL TYPES. 14. GENERAL: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVIEW ALL DRAWINGS TO ENSURE THIS REQUIREMENT IS MET. 15. SHEET S-001; GENERAL STRUCTURAL NOTES (FOUNDATIONS): NOTE 1 INDICATES A SOIL REPORT. PLEASE PROVIDE A REFERENCE TO THE PROJECT MANUAL FOR THAT REPORT. 16. SHEET S-102; DETAIL T34: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE LIGHT POLE FOUNDATION. 17. SHEETS S-201, S-202, AND S-203; KEYNOTES: NOTE 13 REFERENCES TYPICAL DETAIL T47 FOR A CONCRETE CLOSURE POUR. PLEASE REVISE THE DETAIL REFERENCE. 18. SHEETS S-301, S-302, AND S-303; KEYNOTES: NOTE 14 REFERENCES TYPICAL DETAILS T42 AND T43 FOR FRAMING AT OPENINGS. PLEASE REVISE THE DETAIL REFERENCES. 19. SHEET S-302; MECHANICAL WEIGHTS SCHEDULE: THE UNIT D WAS NOT LOCATED ON THE PLANS. PLEASE VERIFY. 20. SHEET S-502: THIS SHEET IS MISSING FROM THE SUBMITTAL SET. 21. SHEET AF101 (FLOOR PLAN); SHEETS G-001, G-002, G-003, AND G-004 (FLOOR PLANS): IF THE NORTH ARROW INDICATED ON SHEET AF101 IS CORRECT (WHICH WOULD BE UP SHEET ON THE G PLANS), IT APPEARS THE LAYOUTS ARE REVERSED (OR THE DESIGNATIONS A, B, AND C ARE REVERSED) ON THOSE G SHEETS. PLEASE COORDINATE. 22. SHEETS AF101, AF1A1, AF1A2, AF1B1, AF1B2, AF1C1, AF1C2, AND AR101: THE SHEET REFERENCES BELOW THE PLAN TITLES ARE INCORRECT. PLEASE REVISE. 23. SHEETS AF1A2, AF1B2, AND AF1C2; FLOOR PLANS: PLEASE REFERENCE ON THESE SHEETS THE LOCATIONS OF THE WALL SCHEDULE, DOOR SCHEDULE, AND WINDOW SCHEDULE. VERIFY ALL WALLS ARE IDENTIFIED ON THE PLAN, AND THE WALL SCHEDULE INDICATES FIRE RESISTANCE RATING REQUIREMENTS. IT APPEARS THE PLANS ON SHEETS G-002, G-003, AND G-004 ARE INDICATING SMOKE PARTITIONS, BUT THESE (AND OTHER RATED WALLS) NEED A REFERENCE TO A WALL SCHEDULE. 24. SHEETS AF1A2, AF1B2, AND AF1C2; PLAN NOTES: VERIFY ALL NOTES LISTED ARE INDICATED ON AT LEAST ONE OF THESE THREE PLANS. 25. SHEETS AC001, AC-1A1, AC-1B1, AND AC-1C1: THE SHEET REFERENCES BELOW THE PLAN TITLES ARE INCORRECT. PLEASE REVISE. 26. SHEETS A-201, A-202, A-203, AND A-204: THE SHEET REFERENCES BELOW THE ELEVATION TITLES SHOULD BE REVIEWED AND REVISED AS REQUIRED. 27. SHEET A-202; ELEVATION 6: THE SHEET REFERENCE INDICATED FOR THIS ELEVATION SHOULD BE REVISED. 28. SHEET A-301; ALL SECTIONS: THE SHEET REFERENCE INDICATED FOR THESE SECTIONS SHOULD BE REVISED. 29. SHEETS A-301, A-302, AND A-303: THE SHEET REFERENCES BELOW THE SECTION TITLES SHOULD BE REVIEWED AND REVISED AS REQUIRED. 30. SHEET A-331; SECTION 4: PLEASE MOVE THE SECTION CUT SO IT IS LEGIBLE. 31. SHEET A-341; TOWER ELEVATION 3A: PLEASE ADD THE SCALE/REFERENCE BELOW THE TITLE. 32. SHEET A-341; TOWER PLANS: PLEASE REVISE THE REFERENCES BELOW THE PLAN TITLES TO 1/AF1B2. 33. SHEET A-401: PLEASE ADD GRAB BAR AND CONTROL DETAILS FOR THE BATHTUBS PER THE ICC/ANSI SECTION 607. 34. SHEETS A-401 AND A-402: PLEASE VERIFY ALL SHEET REFERENCES BELOW THE PLAN TITLES. 35. SHEET A-411; GENERATOR WALL SECTION 2: THE MASONRY WALL AND CONCRETE FOOTING MUST HAVE STRUCTURAL CALCULATIONS. PLEASE PROVIDE. 36. SHEET A-420: PLEASE VERIFY ALL SHEET REFERENCES BELOW THE ELEVATION TITLES. 37. SHEET A-425; CASEWORK SECTIONS: MANY SECTIONS INDICATE TO 'REFERENCE TO ELEVATION' FOR HEIGHTS. PLEASE PROVIDE THESE HEIGHTS ON THE ELEVATIONS AND/OR THE SECTIONS. 38. SHEET A-601: PLEASE VERIFY ALL SHEET REFERENCES BELOW THE FRAME ELEVATION TITLES. 39. SHEET A-602; DOOR SCHEDULES: PLEASE VERIFY ALL DOORS REQUIRING A FIRE RESISTANCE RATING OR DOORS IN SMOKE PARTITIONS MEET THE REQUIREMENTS OF THE IBC TABLE 716.5. 40. SHEET A-602; DOOR SCHEDULES: PLEASE VERIFY ALL DOOR HARDWARE MEET THE REQUIREMENTS OF THE IBC SECTION 1008.1.9. PLEASE INDICATE ON THIS SHEET THE LOCATION OF THE HARDWARE SETS AS INDICATED IN THE SCHEDULES. 41. GENERAL: PLEASE INDICATE ON THE DRAWINGS THE REQUIREMENTS OF THE IBC SECTION 1006 FOR MEANS OF EGRESS ILLUMINATION ARE MET. 42. GENERAL: PLEASE INDICATE ON THE DRAWINGS THE REQUIREMENTS OF THE IBC TABLE 2902.1 FOR PLUMBING FIXTURES ARE MET (DRINKING FOUNTAINS AND SERVICE SINKS REQUIRED AND PROVIDED). 43. GENERAL: PLEASE INCLUDE ON THE DRAWINGS A DETAIL FOR A HIGH/LOW DRINKING FOUNTAIN PER THE ICC/ANSI SECTION 602. 44. GENERAL: PLEASE INDICATE ON THE DRAWINGS THE REQUIREMENTS OF THE IBC SECTION 1007.10 FOR DIRECTIONAL SIGNAGE (IF AN IS REQUIRED) ARE MET. 45. GENERAL: PLEASE INDICATE ON THE DRAWINGS THE REQUIREMENTS OF THE IBC SECTION 1011 FOR EXIT SIGNAGE ARE MET. 46. GENERAL: PLEASE INDICATE ON THE DRAWINGS THE REQUIREMENTS OF THE IBC SECTION 1025 FOR HORIZONTAL EXITS ARE MET. 47. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 05/09/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | IMPACT FEE CREDITS TO BE DETERMINED |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/10/2016 | AHINES2 | OUT TO CUSTOMER | Completed |