Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T16CM02393
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/05/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/20/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET G1; CODE CHECK (GENERAL BUILDING HEIGHT): NOTE 3 INDICATES TYPE IV CONSTRUCTION. PLEASE REVISE. 2. SHEET G1: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE AS REQUIRED. 3. SHEET A1; REFLECTED CEILING PLAN: A SECTION CUT REFERENCES 6/A4. PLEASE REVISE THE REFERENCE. 4. SHEET A2; SECTION 2: AN ENLARGED WALL DETAIL REFERENCES 4/A3. PLEASE REVISE THE REFERENCE. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 04/22/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the specified urinal meets the hydraulic performance requirements of ASME A112.19.2/CSA. Reference: Section 419.1, IPC 2012. 2. Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-03. 3. Clarify the lack of tempered water for the restroom lavatories. Reference: Sections 416.5 and 607.1.2, IPC 2012. 4. The rim elevation of the next upstream sanitary manhole (#6646-02, 2355.1') is less than 12" below the first floor elevation (2355.8'). Provide a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson. |
| 04/22/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 04/22/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/25/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Principle Planner PROJECT: Estevan Park Comfort Station T16CM02393 Building Plan (1st Review) TRANSMITTAL DATE: April 25, 2016 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. As a new structure is proposed on site a development package is required to be reviewed and approved prior to approval of the building plans. As this is a minor change to the park site Zoning is willing to do the development package review as an over-the-counter review on an hourly basis. 3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 05/02/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide a complete grounding electrode system as required per 2011 NEC arts. 250.32 and 250.50 at the new structure. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/04/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |