Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T16CM02169
Parcel: 12810079B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T16CM02169
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/23/2016 STEVE SHIELDS ZONING REVIEW Approved
03/23/2016 LOREN MAKUS ENGINEERING REVIEW Approved
03/23/2016 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
03/23/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A1.0; CODE REVIEW CHECKLIST: UNDER THE GENERAL BUILDING SUMMARY, THE BUILDING AREA IS LISTED AS 9411 SF. UNDER THE OCCUPANT LOADING, THE AREA IS LISTED AS 8307 SF. THE IBC TABLE 1004.1.2 INDICATES BUSINESS OCCUPANCY IS BASED ON GROSS SF. PLEASE REVISE.
2. SHEET A2.0; FLOOR PLAN: THE TITLE AND KEYNOTES INDICATE THIS IS THE DEMOLITION FLOOR PLAN. THE PLAN ALSO INCLUDES NEW PARTITION WALLS (#22 AND #23). PLEASE CLARIFY.
3. SHEET A2.0; FLOOR PLAN: PLEASE PROVIDE AN EXITING PLAN INDICATING THE MEANS OF EGRESS TO EACH EXIT (STAIRWAY/ELEVATOR). IT APPEARS THE NEW PARTITIONS HAVE ALTERED THE MEANS OF EGRESS TO GO THROUGH NEW AREAS.
4. SHEET A2.0; FLOOR PLAN: PLEASE VERIFY THE MEANS OF EGRESS DO NOT INCLUDE DEAD END CORRIDORS PER THE IBC SECTION 1018.4, OR EXIT EGRESS PER THE IBC SECTION 1014.2.
5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
03/23/2016 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/24/2016 MARTIN BROWN FIRE REVIEW Approved
03/25/2016 AHINES2 PLUMBING-COMMERCIAL REVIEW Needs Review
03/25/2016 AHINES2 MECHANICAL-COMMERCIAL REVIEW Needs Review
03/25/2016 AHINES2 WATER REVIEW Needs Review