Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM01960
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/25/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 04/08/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012. 2. The Mechanical Compliance Certificate on sheet M9.1 indicates that high efficiency HVAC systems will be used to fulfill the requirements of Section C406, IECC 2012 (Additional Efficiency Package Options). Verify this selection as part of the envelope compliance calculations. Reference: Section C401.2, IECC 2012. 3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. |
| 04/08/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/11/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a water pressure regulator conforming to ASSE 1003 or CSA B356 to limit the water pressure to 80 PSI or less. Reference: Section 604.8, IPC 2012. |
| 04/14/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET T0.0; CODE CHECK (BUILDING HEIGHT AND AREAS): THE TOTAL ALLOWABLE BUILDING AREA PER THE IBC SECTION 506.3 IS 36,000 (9000 + 27,000). PLEASE REVISE THE NOTE. 2. SHEET T0.0; CODE CHECK (CORRIDOR EGRESS WIDTH): TABLE 1018.2 ALLOWS A 36" MINIMUM CORRIDOR WIDTH. PLEASE REVISE THE NOTE. 3. SHEET T0.0; CODE CHECK (NUMBER OF EXITS): REFERENCE IS MADE TO THE IBC SECTION 1014. PLEASE REVISE THAT REFERENCE TO SECTION 1015. 4. SHEET T0.0; CODE CHECK (EXIT ACCESS TRAVEL DISTANCE): REFERENCE IS MADE TO THE IBC TABLE 1015.1. PLEASE REMOVE THAT REFERENCE. 5. SHEET T0.0; CODE CHECK (LENGTH OF DEAD END CORRIDORS): REFERENCE IS MADE TO THE IBC SECTION 1016.2. PLEASE REVISE THAT REFERENCE TO SECTION 1018.4. 6. SHEET A1.1; FLOOR PLAN: IT APPEARS THE SECOND EXIT (OFFICE 117) REQUIRES EGRESS THROUGH A ROOM THAT CAN BE LOCKED (DOOR 117 REQUIRES A CARD READER). PER THE IBC TABLE 1015.1, ONLY ONE EXIT IS REQUIRED. IN ORDER FOR THAT TO BE ALLOWED, THE TABLE 1014.3 MAXIMUM PATH OF EGRESS TRAVEL (100 FEET WITH A SPRINKLER SYSTEM) MUST NOT BE EXCEEDED PER THE IBC SECTION 1015.1(2). PLEASE INDICATE ON THE PLAN THIS REQUIREMENT IS MET. MEASURE THAT DISTANCE USING THE IBC SECTION 1016.3 GUIDELINES. PLEASE REVISE THE CODE CHECK ON SHEET T0.0 FOR THIS CONDITION. 7. SHEET A1.1; FLOOR PLAN: THE ICC/ANSI FIGURE 404.2.3.5 INDICATES MINIMUM CLEARANCE WIDTHS FOR THE PUSH AND PULL SIDES OF DOORS. IT APPEARS DOOR 101 (ON PUSH SIDE), DOOR 110 (ON PUSH SIDE), DOOR 111 (ON PUSH SIDE), DOOR 112 (ON PUSH SIDE), DOOR 117 (ON PUSH SIDE), AND DOOR 118 (ON PUSH SIDE) DO NOT MEET THE 12" MINIMUM CLEAR DISTANCE REQUIRED. PLEASE VERIFY. 8. SHEET A6.0; ENLARGED PLANS 1, 6, AND 11: PLEASE INDICATE ON THESE PLANS THE 60" X 56" CLEAR SPACE REQUIRED AT WATER CLOSETS PER THE ICC/ANSI FIGURE 604.3. 9. SHEET A6.1; ELEVATION 6: PLEASE INDICATE THE COUNTER HEIGHT ABOVE THE FINISH FLOOR. 10. SHEET A12.0; DETAIL 3: A NOTE ABOVE THE CEILING INDICATES 'STUD WALL PER PARTITION SCHEDULE. USE W3 WHERE NOT NOTED'. THERE IS NO W3 IN THE SCHEDULE. PLEASE REVISE. 11. SHEET A15.0; DOOR SCHEDULE: DOORS 101E, 117A, AND 127 ARE NOT INCLUDED IN THE SCHEDULE. PLEASE INCLUDE IN THE SCHEDULE AND INDICATE IF THEY ARE EXISTING DOORS. 12. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 04/19/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/18/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/27/2016 | RBENT1 | APPROVAL SHELF | Completed |
| 04/27/2016 | RBENT1 | OUT TO CUSTOMER | Completed |
| 04/27/2016 | RBENT1 | REJECT SHELF | Completed |