Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 4TH
Permit Number - T16CM01533
Review Name: REVISION - - 4TH
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T16CM01533 160 s Avenida Del Convento Mixed Use (Revision) – PAD-10 TRANSMITTAL: September 23, 2021 1. Per PAD-10 Design Review is required prior to approval of this revision. Provide the design review stamped plans with your next submittal 2. As it appears that changes are proposed to D05-0022 sheet 2 a revision is required to the development plan prior to approval of this revision. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
09/29/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/05/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The ground floor mechanical plan on sheet M1.1 calls for 3335 CFM of outside air for the retail and office spaces (including 50 CFM for each restroom). What is the source of this outside air? |
10/05/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show how the floor sink (FS-1), the Lavatory (LAV), and the bathtub (BT) located on the third floor of the waste and vent schematic on sheet P1.3 for units B3-B3 are vented. Reference: Section 901.2.1, IPC 2012. 2. Clarify the venting method used for the waste and vent schematics for units C2_ALT-C2_ALT-C2_ALT and for units C2-C2-C2 on sheer P1.3. Reference: Section 901.2.1, IPC 2012. 3. Clarify the waste and vent diagram for B1-B2-B2-B2 on sheet P1.3. a horizontal drain for a sink, washer box, and a floor sink discharges into a 4-inch vertical stack which then immediately connects vertically into another horizontal drain without a ten-diameter offset. Reference: Section 704.3, IPC 2012. 4. Provide a vent for the bathtubs on the third and fourth floors of the waste and vent schematic for units A1-A1-A1-A1 shown on sheet P1.2. Reference: Section 901.2.1, IPC 2012. 5. The addition of the roof drainage areas used for determining the size of the rainwater leaders (2012 IPC uses areas, not GPM) as shown in the plumbing floor plan, 1/P1.1, is incorrect. Reference: Section 1106.3, IPC 2012. |
10/06/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments and provide a written response. 1.Provide complete clouded areas showing all the revisions and or changes. The incomplete clouded areas make it difficult to determine the exact scope of work and inventory of devices and equipment. 2. All the panel schedules show the panels marked as “NEW”, yet they are not all shown on the electrical line diagrams. Also correlate with the load calculations shown on plan sheet ‘EP 701.’ Please clarify. 3. Verify the the scope of work includes areas marked with DELTAS #8 through #14 only, as the permit application states under ‘Document Type’. 4. See ‘Exterior Lighting Plans’. Is the exterior lighting all New? Revised? Also correlate with the Outdoor lighting lumen calculations, be sure to include all lighting on the parcel. Please clarify. 5. Revise the COMBINED REVISIONS NARRATIVE that was included in the plan submittal to include detailed work descriptions next to the plan sheet identifications. REF; 2018 IBC 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements , Tucson/Pima County Outdoor Lighting Code. |
10/25/2021 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/25/2021 | VVERA1 | OUT TO CUSTOMER | Completed |