Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
02/23/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise the size of the water service pipe for the kiosk, as shown on the site plans, from 5/8-inch to 3/4-inch. Reference: Section 603.1, IPC 2012. (See also the Plumbing Water Supply Riser Diagram, sheet P-1.) |
02/23/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/26/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Reqs Change | DATE: March 1, 2016 DUE DATE: March 17, 2016 SUBJECT: New Fuel Island and Kiosk TO: Ali Samih Fakih, PE LOCATION: 1805 W Valencia REVIEWERS: Paul Baughman, PE, CFM ACTIVITY: T16CM01211 and T16CM01211 SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed: 1) Per TSM 2-01.4.1 and AM 2-06.4.9M1 a grading plan (DP16-031) and permit is required prior to approval of these plans. 2) Per TSM 2-01.2.4.1C6 please dimension the 20' minimum horizontal separation between the fuel canopy structure and the Stormtech disposal area that the canopy drains into. This requirement is based on the September 2, 2008 supplemental geotechnical recommendations from LMT Engineering, Inc for the master site. 3) There is a General Paving and Grading Note number 9 that refers to a Geotechnical Report performed by Speedie and Associates Project Number 141853ST, dated November 24, 2015. If there is a new Geotechnical report it should be provided for review and comparison to the submitted plans with the next submittal. 4) Please update utility note 1 on the Utility plan sheet to clarify which sheet is intended to show additional general notes. If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov. |
03/03/2016 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
03/10/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1.00; PLANS: PLEASE ADD NORTH ARROWS TO THE PLANS. 2. SHEET A1.00 (FOUNDATION PLAN); SHEET F-1 (FOUNDATION PLAN): THE FOUNDATION WIDTHS DO NOT MATCH ON THESE TWO PLANS. PLEASE COORDINATE. 3. SHEET A1.00; FOUNDATION PLAN: THIS PLAN HAS SECTIONS 5/A1.0 AND 8/A1.0 INDICATED. PLEASE REVISE THOSE SECTION REFERENCES. 4. SHEET A1.00; EQUIPMENT PLAN: THIS PLAN HAS A SECTION 4/A3.-0 INDICATED. PLEASE REVISE THE SECTION REFERENCE. 5. SHEET CS-1; DESIGN CODES: PLEASE REMOVE THE 2009 EDITION OF THE IBC, IPC, IMC, IFC AND IECC. REMOVE THE 2008 EDITION OF THE NEC AND THE 2003 EDITION OF THE ANSI A117.1. 6. SHEET CS-1; DESIGN CRITERIA: THE SNOW LOAD MAY BE REMOVED OR LISTED AS N/A. 7. SHEET F-1; FOUNDATION PLAN: PLEASE ADD A NORTH ARROW TO THIS PLAN. 8. SHEET A-1; FLOOR PLAN: PLEASE ADD A NORTH ARROW TO THIS PLAN. 9. SHEET S-1; PLANS: PLEASE ADD A NORTH ARROW TO THE PLANS. 10. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
03/10/2016 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
03/17/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 1805 W. Valencia Road T16CM01211, T16CM01212 & T16BU00269 Building Plan (1st Review) TRANSMITTAL DATE: March 17, 2016 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. It appears that the proposed fuel center matches what is shown on development package DP15-0037 but until grading plan DP16-0031 is approved the building plans cannot be approve. 3. Until the plans are approved by all PDSD agencies Zoning cannot approve the building plans. 4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
03/17/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/18/2016 | FRODRIG2 | LANDFILL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/06/2016 | RBENT1 | APPROVAL SHELF | Completed |
04/06/2016 | RBENT1 | OUT TO CUSTOMER | Completed |
04/06/2016 | RBENT1 | REJECT SHELF | Completed |