Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
02/23/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/23/2016 ROBERT SHERRY WATER REVIEW Passed
02/26/2016 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: March 1, 2016
DUE DATE: March 17, 2016
SUBJECT: New Fuel Island and Kiosk
TO: Ali Samih Fakih, PE
LOCATION: 1805 W Valencia
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: T16CM01211 and T16CM01211
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Per TSM 2-01.4.1 and AM 2-06.4.9M1 a grading plan (DP16-031) and permit is required prior to approval of these plans.
2) Per TSM 2-01.2.4.1C6 please dimension the 20' minimum horizontal separation between the fuel canopy structure and the Stormtech disposal area that the canopy drains into. This requirement is based on the September 2, 2008 supplemental geotechnical recommendations from LMT Engineering, Inc for the master site.
3) There is a General Paving and Grading Note number 9 that refers to a Geotechnical Report performed by Speedie and Associates Project Number 141853ST, dated November 24, 2015. If there is a new Geotechnical report it should be provided for review and comparison to the submitted plans with the next submittal.
4) Please update utility note 1 on the Utility plan sheet to clarify which sheet is intended to show additional general notes.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
03/03/2016 KEN BROUILLETTE FIRE REVIEW Approved
03/10/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET CS-1; DESIGN CRITERIA (FOUNDATION): PLEASE PROVIDE ONE COPY OF THE GEOTECHNICAL REPORT FOR REVIEW.
2. GENERAL: PLEASE PROVIDE A WRITTEN RESPONSE TO THE REVIEW COMMENT.
03/17/2016 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 1805 W. Valencia Road
T16CM01211, T16CM01212 & T16BU00269
Building Plan (1st Review)

TRANSMITTAL DATE: March 17, 2016

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. It appears that the proposed fuel center matches what is shown on development package DP15-0037 but until grading plan DP16-0031 is approved the building plans cannot be approve.

3. Until the plans are approved by all PDSD agencies Zoning cannot approve the building plans.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
03/17/2016 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide complete compliance with the Tucson/Pima County Outdoor Lighting Code and IECC for interior lighting. Also provide a written response. The Outdoor Lighting Code can be downloaded from www.tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
04/06/2016 RBENT1 APPROVAL SHELF Completed
04/06/2016 RBENT1 OUT TO CUSTOMER Completed
04/06/2016 RBENT1 REJECT SHELF Completed