Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM00986
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/16/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the backwater note in the Plumbing General Notes on sheet P1.2; a backwater valve is required for this activity. Reference: Section 107.2.1, IBC 2012. 2. Verify that the automatic faucets for the lavatories will operate for a minimum time of 10-seconds. Reference: Section 606.4, ICC/ANSI A117.1-03. 3. Verify that the horizontal branches connect no closer than ten diameters downstream of the bases of vertical stacks (e.g. the vertical stacks from rooms 204 and 216). Reference: Section 704.3, IPC 2012. 4. Correct the size of the horizontal drain between P-7 and P-2A in the second floor women's restroom. Reference: Section 706.2, IPC 2012. 5. Assuming that each change of direction in the horizontal drains has been no greater than 45-degrees, provide an additional 4" cleanout for the 1st floor building drain that is over 40-feet in developed length from the 4" cleanout located above P-2A in the 1st floor women's restroom. Reference: Section 708.3.3, IPC 2012. 6. Assuming that each change of direction in the horizontal drains has been no greater than 45-degrees, provide an additional 4" cleanout for the continuation of the 2nd floor building drain that is over 40-feet in developed length from the 4" cleanout located at the base of the stack in the 1st floor women's restroom. Reference: Section 708.3.3, IPC 2012. 7. Correct the total connected gas load as shown in the gas isometric 3/P2.1 and the plumbing floor plan 1/P1.1; it should be 894 CFH, not 798 CFH. |
02/16/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/17/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Coordinate the balancing data for the supply air flows for AC-3, AC-6, AC-7, and AC-8; the scheduled supply air flows do not agree with the air flows shown on the mechanical floor plans. Reference: Section 107.2.1, IBC 2012. 2. Coordinate the balancing data for the air flows for EF-1; the scheduled air flow does not agree with the total air flow shown on the mechanical floor plans. Reference: Section 107.2.1, IBC 2012. 3. Provide the balancing data for the return from room 220. Reference: Section 107.2.1, IBC 2012. 4. Verify that Hall 104 is not being used for a return air duct by AC-4. Reference: Section 601.2, IMC 2012. |
02/23/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/26/2016 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
03/04/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET G1.0; SECOND FLOOR EXIT PLAN: THE TWO EXIT STAIRS INDICATE 44 TOTAL OCCUPANTS (21 + 23), WHILE THE OCCUPANT LOAD TABLE ON THIS SHEET INDICATES 58 TOTAL OCCUPANTS. PLEASE CLARIFY. 2. SHEET G1.0; PLUMBING FIXTURE REQUIREMENTS: THE IBC TABLE 2902.1 INDICATES TWO MALE AND FEMALE WATER CLOSETS WOULD BE REQUIRED ON EACH FLOOR (1:25 FOR FIRST 50). IT APPEARS BOTH MEN'S AND WOMEN'S RESTROOMS MEET THAT ON EACH FLOOR, BUT THE FIXTURE TABLE NUMBERS SHOULD BE REVISED. PLEASE VERIFY. 3. SHEET S1.0; GENERAL STRUCTURAL NOTES (FOUNDATIONS): NOTE 1 INDICATES A SOILS REPORT WAS PROVIDED FOR THIS PROJECT. PLEASE PROVIDE ONE COPY FOR REVIEW. THE STRUCTURAL CALCULATIONS INDICATE THE FOUNDATION DESIGN IS BASED ON IBC CRITERIA (TABLE 1306.2). 4. SHEET S2.0; FOOTING SCHEDULE: WHERE IS THE FOOTING F1 LOCATED ON THE PLAN? PLEASE VERIFY. 5. SHEET S3.0; ENLARGED STAIR PLAN: ARE THE WOOD JOISTS SOUTH OF THE NEW STAIR EXISTING? PLEASE INDICATE ON THE PLANS. 6. SHEETS S3.0 AND S3.1; GENERAL NOTES: REVISE THE TITLE FROM 'FOUNDATION NOTES'. 7. SHEET A2.0; LEGEND: PLEASE REVISE THE NEW MILLWORK SHEET REFERENCE FROM A6.0. 8. SHEET A2.3; STAIR PLANS 1 AND 2: PLEASE VERIFY THE DOOR OPENING ONTO A LANDING DOES NOT REDUCE THE LANDING TO LESS THAN 1/2 THE REQUIRED WIDTH PER THE IBC SECTION 1009.8. 9. SHEET A9.0; ELEVATION 1: THIS COUNTER MUST MEET THE HEIGHT LIMITATION OF 34" MAXIMUM ABOVE FINISH FLOOR PER THE ICC/ANSI SECTION 902.4. PLEASE VERIFY. 10. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
03/08/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |