Permit Number: T16CM00934
Parcel: 11706319B

Address:
300 S TOOLE AV

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T16CM00934
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/22/2016 ROBERT SHERRY WATER REVIEW Completed
02/24/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approved
03/10/2016 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: AutoBahn Indoor Speedway
T16CM00934
Building Plan (1st Review)

TRANSMITTAL DATE: March 10, 2016

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. As the proposed use is a change of use and the existing parking will not meet code requirements, this project will need to meet the requirements of UDC Section 3.3.3.H. Zoning has provided two (2) copies of the 2005 aerial photo and a blank copy of the affidavit to complete this process. Once the provide affidavit has been notarized return the aerial photos along with the affidavit to the Zoning counter for approval.

3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
03/14/2016 KEN BROUILLETTE FIRE REVIEW Reqs Change 1. Please indicate how battery system complies with section 608 of the 2012 IC.
2. The storefront doors are required to have panic hardware per the 2012 IFC section 1008.1.9.3.
3. On sheet E2.1, it indicates some Emergency egress lighting, but it does not appear to meet Section 1006 of the 2012 IFC. Please indicate how this requirement will be met.
03/16/2016 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
03/16/2016 FRODRIG2 3RD PARTY REVIEW-COMMERCIAL REVIEW Completed
03/16/2016 FRODRIG2 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
03/16/2016 FERNE RODRIGUEZ OUT TO CUSTOMER Completed