Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM00864
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/10/2016 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Contact the Flowing Wells Irrigation District to determine if a reduced pressure backflow preventer will be required to protect the municipal water distribution from activities in this building. Reference: Arizona Administrative Code R18-4-215. http://apps.azsos.gov/public_services/Title_18/18-04.pdf |
| 02/11/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008). 2. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the outer circle of the registrant's seal shall be 1-1/2" in diameter, +/- 1/16". See Appendix A of the Rules of the Arizona State Board of Technical Registration for further information regarding seals. 3. Revise the font size used on the drawings to a minimum of 3/32-inch (both upper and lower case lettering). Reference: Section 107.2.1, IBC 2012. 4. Show how air for combustion, ventilation and dilution of flue gases is being supplied for the proposed water heater. Reference: Section 304, IFGC 2012. 5. Provide sediment traps for the natural gas supply to RTU-1 and to WH-1 downstream of the appliance shut off valve, as close to the equipment as possible. Reference: Section 408.4, IFGC 2012. 6. Specify the type of venting system and the venting materials to be used for the proposed water heater, WH-1. Reference: Section 503.1, IFGC 2012. 7. Coordinate the layout of the proposed restroom with the architect. Reference: Section 107.2.1, IBC 2012. 8. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012. 9. Specify the piping materials to be employed in this activity (e.g. water distribution, water service, and building sewer). Reference: Section 107.2.1, IBC 2012. 10. Provide underground facility tracer wires per ARS 40-360.22. 11. Provide an automatic faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the automatic faucet will operate for a minimum time of 10-seconds. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-03. 12. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Note the manufacturer's required minimum temperature for hot water supplied to the mixing valve. Reference: Sections 303.2, 416.5 and 607.1.2, IPC 2012. 13. Provide a shower control valve that complies with the requirements of Sections 424.3 and 424.5, IPC 2012. 14. If the shower does not have a pre-fabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 417.5.2, IPC 2012. 15. Clarify the termination point of the T&P relief discharge piping. Reference: Section 504.6, IPC 2012. 16. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference: Section C404.4, IECC 2012. 17. If the specified water heater is not supplied with integral heat traps, provide 0.5" of insulation with a maximum conductivity of 0.27 BTU per inch/h F on the first 8 feet of supply and discharge piping. Reference: Section C404.5, IECC 2012. 18. Revise the water heater detail on sheet P-1 to show all of the notes that have been cut off. Reference: Section 107.2.1, IBC 2012. 19. Provide calculations showing how the water supply piping has been sized. Reference: Sections 604.1 and 604.3, IPC 2012. 20. Identify the water pressure that will be provided to this address. If the water pressure will exceed 80 PSI, provide a water pressure regulator conforming to ASSE 1003 or CSA B356 to limit the water pressure to 80 PSI or less. Reference: Section 604.8, IPC 2012. 21. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2012. 22. Provide for sterilization and testing of the domestic water system per Section 610, IPC 2012. 23. Provide a cleanout at the junction of the building drain and the building sewer. Reference: Section 708.3.5, IPC 2012. |
| 02/11/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008). 2. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that the outer circle of the registrant's seal shall be 1-1/2" in diameter, +/- 1/16". See Appendix A of the Rules of the Arizona State Board of Technical Registration for further information regarding seals. 3. Demonstrate energy code compliance for the addition and alterations to the building envelope based on the current code (e.g. submit COMcheck Envelope Compliance Certificate). Reference: Sections C101.4.3, C101.5, C103.2, C303, and C401.2.1, International Energy Conservation Code 2012. 4. Show that the mechanical systems for the building comply with the current energy code (e.g. provide the COMcheck Mechanical Compliance Certificate). Reference: Sections C101.4.3, C101.5, C103.2, and C403, International Energy Conservation Code 2012. 5. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 6. Show the minimum seasonal energy efficiency rating (SEER) for the scheduled air conditioning unit. Reference: Section C403.2.3, IECC 2012. 7. Show that each rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and automatic start-up control (i.e. the thermostat is capable of automatically adjusting the start time of the HVAC equipment in order to bring the interior conditions to the desired temperature at the start of occupancy) and, if the thermostat does not require manual changeover from the heating and cooling modes, it restricts set point overlap. Reference: Section C403.2.4, IECC 2012. 8. Clarify how excess outside air relief from the building is to be accomplished during economizer operation. Reference: Section C403.3.1.1.4, IECC 2012. 9. Provide guards for equipment (e.g. RTU-1) located within 10 feet of a roof edge that is elevated more than 30 inches above the adjoining grade. Reference: Section 304.11, IMC 2012. 10. Show the size, routing, and termination of the condensate drain for RTU-1. Reference: Section 307.2.1, IMC 2012 as amended by the City of Tucson. 11. Provide calculations to show how ventilation will be provided for the occupied spaces. Reference: Section 401.2, IMC 2012. 12. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restroom will be exhausted. Reference: Section 403.2.1 (4), IMC 2012. 13. Ventilation for shower rooms in public spaces requires a minimum of 20 CFM of mechanical exhaust per shower head if the exhaust is continuous and 50 CFM if the exhaust is intermittent. Reference: footnote f, Table 403.3, IMC 2012. 14. Provide exhaust for the kitchen. Reference: Sections 403.2.1, 403.3, and 507.2.2, IMC 2012. |
| 02/22/2016 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Needs Review |