Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T16CM00785
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/10/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
02/11/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
02/11/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/19/2016 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/26/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1; FLOOR PLAN KEYNOTES: NOTE 3 REFERENCES DETAIL 1 ON SHEET A1 FOR A METAL STUD WALL. PLEASE REVISE THE DETAIL REFERENCE. 2. SHEET A1; FLOOR PLAN KEYNOTES: NOTE 11 REFERENCES DETAILS ON SHEET A2 FOR THE ROOF HATCH AND RAILING. PLEASE REVISE THE DETAIL REFERENCE. 3. SHEET A1; FLOOR PLAN KEYNOTES: NOTE 5 INDICATES TO SEE STRUCTURAL FOR NEW STEEL BEAMS. THOSE BEAMS ARE INDICATED ON SHEET A2. PLEASE REVISE THE NOTE. 4. SHEET A1 (FLOOR PLAN); BEAM/COLUMN SCHEDULE: PLEASE MOVE THE BEAM AND COLUMN SCHEDULE TO SHEET A2. 5. SHEET A2; BUILDING SECTION/ROOF FRAMING PLAN/FLOOR FRAMING PLAN: ALL DETAILS/SECTIONS INDICATE SHEET A2. PLEASE REVISE THAT SHEET NUMBER. 6. SHEET A3 (SECTION 11); STRUCTURAL CALCULATIONS: THE FOOTING SECTION INDICATES #3 @ 12" O.C. REINFORCING TOP AND BOTTOM, WHILE THE CALCULATION INDICATES #5 @ 6" O.C. PLEASE COORDINATE. 7. SHEET A3; SECTION 11: A NOTE INDICATES TO SEE STRUCTURAL FOR THE STEEL COLUMN. PLEASE REFERENCE SHEET A2. 8. GENERAL: PLEASE LIST ON THE DRAWINGS MATERIAL SPECIFICATIONS (CONCRETE, REINFORCING, STRUCTURAL STEEL, WELDING, PLYWOOD, STEEL STUDS, ETC.). 9. GENERAL: PLEASE LIST ON THE DRAWINGS DESIGN LOADS (ROOF LL, FLOOR LL, DESIGN WIND SPEED, DESIGN SEISMIC CLASSIFICATION, ALLOWABLE SOIL BEARING, ETC.). 10. STRUCTURAL CALCULATIONS: PLEASE PROVIDE TWO SETS OF STRUCTURAL CALCULATIONS. 11. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
03/02/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/03/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
03/04/2016 | STEVE SHIELDS | ZONING | REVIEW | Passed |