Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T16BU01042
Parcel: 13612004H

Review Status: Completed

Review Details: WALLS - SUBMITTAL

Permit Number - T16BU01042
Review Name: WALLS - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/09/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET 5 (SECTION A); STRUCTURAL CALCULATIONS (PAGE 6): THE CALCULATIONS INDICATE MASONRY PIERS UP TO AND INCLUDING 6' HEIGHT SHALL BE REINFORCED WITH 4-#5 VERTICAL, AND PIERS OVER 6' UP TO AND INCLUDING 8' HEIGHT SHALL HAVE 5-#6 VERTICAL. THE PIER SCHEDULE SHOWS ONLY 2 TYPES, AND BOTH HAVE A MAXIMUM OF 4' HEIGHT. PLEASE CLARIFY.
2. SHEET 5; SECTION A: THE VERTICAL BARS INDICATED IN THE PIER SCHEDULE SHOW 4-#5 IN A 24" X 16" PIER, WHILE THE CALCULATIONS INDICATE 5-#6 VERTICALS. PLEASE CLARIFY.
3. SHEET 5 (SECTION A); STRUCTURAL CALCULATIONS (PAGE 7): THE CALCULATIONS INDICATE 3 DIFFERENT FOOTING SIZES FOR MAXIMUM PIER HEIGHTS OF 4', 6', AND 8', WHILE THE PIER SCHEDULE INDICATES A FOOTING SIZE FOR A MAXIMUM PIER HEIGHT OF 4'. PLEASE CLARIFY.
4. SHEET 5; SECTION B: THE SCHEDULE INDICATES A DIMENSION 'A' (4'-0", 6'-0", 8'-0", ETC.). WHAT IS THIS DIMENSION? PLEASE INDICATE ON THE SECTION.
5. SHEET 5 (SECTION B); STRUCTURAL CALCULATIONS (PAGES 26 THROUGH 28): THESE CALCULATIONS ARE FOR A WALL LENGTH UP TO 16', BUT ARE NOT LISTED IN THE SCHEDULE ON SHEET 5. PLEASE CLARIFY.
6. STRUCTURAL CALCULATIONS; PAGES 7 THROUGH 24: THESE ARE LISTED AS SCREEN WALLS WITH VARIOUS WALL REINFORCING AND FOOTING SIZES. WHERE ARE THESE DESIGNS SHOWN ON THE DRAWINGS?
7. STRUCTURAL CALCULATIONS; PAGES 35 THROUGH 43: THESE CALCULATIONS ARE FOR 32'-1" WALL LENGTHS TO 48' WALL LENGTHS, BUT ARE NOT LISTED IN THE SCHEDULE ON SHEET 5. PLEASE CLARIFY.
8. STRUCTURAL CALCULATIONS; PAGES 44 THROUGH 52, PAGES 53 THROUGH 61, PAGES 62 THROUGH 70, AND PAGES 71 THROUGH 79: THESE CALCULATIONS ARE FOR WALL LENGTHS NOT LISTED IN THE SCHEDULE ON SHEET 5. PLEASE CLARIFY.
9. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/12/2016 RBENT2 OUT TO CUSTOMER Completed