Plan Number - T15PI00023
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/08/2016 | CSALTZM1 | DOT ENGINEERING | REVIEW | Approved | Red Colt Ranch T15PI00023 Reviewed by: E. Craig Saltzman 1/8/16 1. Sheet 2&3 of 3- Sidewalk Change sidewalk width from 5’ to 6’ adjacent to Bonanza Ave. (collector) and 22nd St. (arterial) per Development Standards Section 10-01.4A1a 2) Sheet 2 of 3 - Need a detail for Curb Access Ramps at stations 16+69 Lt. & Rt. C.O.T. Detail 207 is for use with curb not header. 3) Sheet 2 of 3 - Note: "112 LF line of Sawcut, Trim Tack & Join, Match Existing Pavement". Need dimension or station to locate sawcut. 4) Sheet 3 of 3 - Cross Section "C" Note reads: Proposed Pavement 2 ½” A.C. on 4” A.B.C. Change to read: Proposed Pavement 2 ½" A.C. (C.O.T. Mix No. 2) on 4" A.B.C. and match existing pavement structural section 5) Sheet 3 of 3 - South East corner of Bonanza Ave. and Red Colt Rd. remove drainage swale from public R/W. |
01/11/2016 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Denied | Date: January 11, 2016 PROJECT NAME: Red Colt Ranch PLAN #: I-2015-020 ACTIVITY NUMBER: T15PI00023 PROJECT REVIEWER: James Femling, Tucson DOT Streets & Traffic Maint. Comments: The TDOT Streets & Traffic Maintenance Division has reviewed the PIA plan and recommends denial/resubmittal. The following comment needs to be addressed in the subsequent plan submittal. 1. For maintenance purposes, use Type 3 scuppers instead of the Type 2. If you have any questions, I can be reached at 791-3154 or James.Femling@tucsonaz.gov |
01/15/2016 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Passed | PER SIGNED UTILITY PLAN RECEIPT, NO EXISTING UTILITIES THAT COULD CONFLICT WITH THE CONSTRUCTION OF THIS PROJECT, SIGNED BY ERNIE ENCINAS ON 12/09/15. |
01/15/2016 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
01/15/2016 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
12/11/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
12/16/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
12/21/2015 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved |