Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T15PI00022
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T15PI00022
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/27/2015 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Denied
10/27/2015 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
10/30/2015 GARY WITTWER DOT LANDSCAPE REVIEW Denied Please submit the approved NPPO plan.
I only received sheet 7 of the landscape plans. Please submit the landscape and irrigation plans.
11/10/2015 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved November 10, 2015


SUBJECT: Kinnison Overlook
PIA Plan I-2015-019, DSD Activity #T15PI00022

PROJECT REVIEWER: Zelin Canchola, TDOT Review Section

DOT Review Section has reviewed the PIA Plan for Traffic Engineering. Approval is granted.



If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
11/19/2015 RICHARD LEIGH DOT ENGINEERING REVIEW Denied November 17, 2015

SUBJECT: Public Roadway Improvement Plans for Kinnison Overlook I-2015-015 T15PI00019

PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal.

1. Include the plan number "I-2015-019" in the title block of each sheet.

2. Include the PIA activity number "T15PI00022 on cover sheet.

3. Include complete details for the drainage improvements within the Kinnison Wash. Improvements must be designed to withstand flows during a 100yr event. Provide all hydraulic calculations for sizing structures.

4. Please Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
11/25/2015 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
11/25/2015 JIM FEMLING DOT STREET MAINTENANCE REVIEW Needs Review
11/25/2015 ERNIE ENCINAS DOT_ELEC REVIEW Needs Review
11/25/2015 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed