Plan Number: T15PI00019
Parcel: Unknown

Address:
8820 E 21ST ST

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T15PI00019
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/29/2015 ZELIN CANCHOLA DOT TRAFFIC REVIEW Approved September 29, 2015


SUBJECT: Camino Seco Village
PIA Plan I-2015-015, DSD Activity #T15PI00019

PROJECT REVIEWER: Zelin Canchola,
DOT Review Section/Traffic Engineering


RECOMMEND APPROVAL

If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
10/13/2015 GARY WITTWER DOT LANDSCAPE REVIEW Approved
10/19/2015 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Completed
10/19/2015 LINZUNZA DOT ENGINEERING REVIEW Approv-Cond Date: October 09, 2015
PROJECT NAME: Public Roadway Improvement Plans for Camino Seco Village
PLAN #: I-2015-015
ACTIVITY NUMBER: T15PI00019
PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review

Comments:

Resubmittal Required: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval. The following comments need to be addressed and plans revised prior to submittal of the mylar plan set for signatures. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal.

1. Include the plan number "I-2015-015" in the title block of each sheet.
2. Include the PIA activity number "T15PI00019" on cover sheet.
3. Address redline comments noted on plan set.

If you have any questions, I can be reached at 791-4259 or Richard.Leigh@tucsonaz.gov
10/19/2015 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
10/19/2015 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
10/21/2015 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
10/22/2015 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
10/22/2015 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed