Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T15PI00010
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 05/06/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 05/18/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | Great submittal. |
| 05/20/2015 | ZCANCHO1 | DOT TRAFFIC | REVIEW | Reqs Change | May 12, 2015 ACTIVITY NUMBER: T15PI00010 PROJECT NAME: The School Yard PROJECT ADDRESS: Wrightstown road PROJECT REVIEWER: Zelin Canchola TDOT Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan therefore a revised plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. Sheet 3 of 9: Remove and relocate speed hump. Include striping and signs. Call Traffic Engineering, Jesse Soto, Neighborhood Traffic Management for alternate location. 791-4259 2. Sheet 3 of 9: Place new object markers (Type 1 OM1-3 MUTCD).along Avenida Ricardo Small facing Wright School Loop eastbound exits to indicate wash ahead as redlined on plan. 3. Show Street Name signs. Must be approved by traffic engineering before fabrication. Call 791-4259 If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov |
| 06/04/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 06/04/2015 | LINZUNZA | DOT ENGINEERING | REVIEW | Denied | Date: June 4, 2015 PROJECT NAME: The School Yard PLAN #: I-2015-006 ACTIVITY NUMBER: T15PI00010 PROJECT REVIEWER: E. CRAIG SALTZMAN, TDOT ENGINEERING REVIEW UNIT Comments: The TDOT Engineering Review Unit has reviewed the PIA Plan and recommends resubmittal. The following comments need to be addressed in the subsequent plan submittal. 1) Sht. 1 of 9 Legend - see Detail 100 of Standard Details for Public improvements 2003 Edition City of Tucson/ Pima County for drafting plan symbols and line weights. 2) Sht. 2 of 9 Storm Drain Notes - Note No. 3: All pipes within City of Tucson Right away shall be concrete reinforced pipe. 3) Sht. 3 of 9 Station 10+80 18" SRP - See note above (typical of all pipes in the City R/W) 4) Sht. 3 of 9 Verify the perk rate of the detention basin. Remove bleeder pipe into Hidden Hills Wash. 5) Sht. 3 thru 7 of 9 Show existing grade at R/W for left and right curb. 6) Sht. 5 of 9 Sta. 21+34 south gutter line - verify will drain (bird bath?) 7) Sht. 6 of 9 Northwest corner of Lee St. and Avenida Ricardo remove existing access ramp and replace with new ADA access ramp. 8) Sht. 7 of 9 At approx. Sta. 23+25 remove existing access ramp and replace with new ADA access ramp. At Southeast corner of Wrightstown Road and Avenida Ricardo remove existing access ramp and replace with new ADA access ramp. 9) Sht. 4 of 9 North arrow shall be Up. Plan will require station equation at centerline angle pt. in eye brow. 10 Sht. 5 of 9 Public sidewalk in CA "A-2" shall require Pedestrian access Easement. If you have any questions, I can be reached at 837-6621 or craig.saltzman@tucsonaz.gov |
| 06/05/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 06/05/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |